Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Concrete surface prep that coatings actually hold to

Every floor we put down is only as good as the slab under it. We grind, blast and scarify to a measured profile, strip what the last crew left, and test for moisture before anything gets mixed.

22 years in businessRepair5.0 on Google from 36 reviews

What it is

Surface prep is the part of the job nobody sees and the part that decides whether a floor lasts. A coating bonds to the top fraction of an inch of concrete. If that top layer is laitance, curing compound, old paint, mastic, grease or a dusty troweled skin, the coating bonds to that and peels off with it. So before any epoxy, urethane cement, overlay or polish, we take the slab down to sound, open concrete with the right texture for what goes on top.

That texture has a name. The industry grades it as a concrete surface profile, CSP 1 through 10, and every system’s data sheet calls for a range. A thin epoxy wants a light profile from a diamond grind. Urethane cement and heavy broadcast systems want a deeper, rougher one, which usually means shot blasting or a scarifier. We match the tool to the number on the submittal, then check it against the profile chips before we call it ready. Every machine we run is hooked to a vacuum, so the dust goes in a bag instead of the ductwork or the next trade’s fresh paint.

Prep can be its own scope, too. A GC can hire us for prep alone: grinding out a slab for another installer, pulling glue down after carpet tile comes up, or opening a floor so a sealer will soak in. Its twin is Concrete Restoration, which fixes what is broken (spalls, cracks, failed joints, a slab that has lost its top). Prep makes sound concrete ready. Restoration makes damaged concrete sound. Most floors need some of both.

Part of our repair work. See all of it.

Start with the concrete.

What goes down, from the surface you walk on to the slab under it.

We will not grind black mastic in an older building until a sample comes back clear of asbestos, because that dust is not worth anybody’s lungs.

  1. Ready surface

    A vacuumed, profiled slab that the coating, overlay or polish crew can bond to that day.

  2. Moisture reading

    Humidity probes or calcium chloride tests show whether the slab needs a vapor-control primer first.

  3. Joints and cracks

    Cracks get chased and filled, spalls patched, and joints cleaned out.

  4. Profile pass

    Diamond grinding or shot blasting cuts the open texture the next system calls for.

  5. Removal pass

    A scarifier or heavy grinding takes coatings, thinset and mastic down to clean concrete.

  6. Slab as found

    Whatever is there when we walk in: curing compound, paint, glue, sealer, oil or bare troweled concrete.

Where it belongs

  • Coating removal

    Old epoxy, paint or a failed sealer that is peeling or yellowed comes off before the new system goes down.

  • Carpet and tile tear-outs

    Black cutback, thinset ridges and carpet glue come up so polish or a coating can go where flooring used to be.

  • New construction slabs

    Fresh slabs carry curing compound and a weak troweled skin, and a grind or blast opens them up.

  • Prep for another installer

    We profile a slab to the CSP your flooring sub needs and hand it over clean and vacuumed.

How the crew runs it

Five steps, in order.

  1. Walk the slab

    Dustin or Jacob looks at what is on the floor, tries a grinder on a couple of spots and reads the spec for what goes down next.

  2. Test for moisture

    Readings go in early, because a wet slab changes the primer and sometimes the whole system.

  3. Strip and profile

    Coatings and adhesives come off first, then grinding, blasting or scarifying cuts the profile, all under vacuum.

  4. Repair and check

    Cracks, spalls and joints get filled, and we compare the surface against profile chips before signing off.

  5. Clean and hand off

    A last vacuum pass leaves bare, clean concrete for the next coat or the next trade.

For the GC or the facility

  • Send the coating spec and we prep to its CSP range, with moisture readings in writing.
  • Grinding and blasting run under vacuum, so nearby trades can usually keep working.
  • Tell us what is on the floor before we price it; hidden glue or old epoxy changes the schedule.
  • Cover a prepped slab quickly, because dust, overspray and foot traffic undo a clean profile.

Gulf South conditions

Down here the slab is rarely as dry as it looks. A high water table pushes moisture vapor up through on-grade slabs, and on a humid morning a cool slab will sweat a film of water across a fresh grind. That is why the moisture test happens before anybody picks a system. A high reading means a moisture-mitigating primer, more time, or a breathable system instead of a sealed one.

Flood and storm cleanup brings its own prep problems: silt in the pores, mud packed into joints, and ruined coatings that have to come off entirely. Older slabs in New Orleans and the river towns can carry decades of paint, glue and patching. Salt air near the coast can leave salts on exposed concrete, and those have to be washed and ground off before anything will bond.

Look at the finish.

“They were well-prepared, using a vacuum system on their grinder to keep the concrete dust to a minimum. They skillfully floated out the damaged sections, and the end result looks flawless.”

Rebecca Bourque, Google review5.0 on Google from 36 reviews

Living with it

A prepped slab is raw concrete and it will not stay clean long. Keep drinks, overspray and foot traffic off it, and keep other trades from staging pallets, lifts or buckets on it. If a prepped area sits more than a few days, plan on a re-vacuum or a light touch-up grind before coating.

Next to this one

If this is not quite it, look at Concrete Restoration.

From Harvey we cover about 100 miles of Louisiana and the Mississippi coast, including Terrytown, Marrero, Woodmere, Estelle.

See finished floors

Questions about concrete surface preparation

See finished jobs in the gallery, or book a slab visit.

What does CSP mean on a coating spec?

It stands for concrete surface profile, a 1 to 10 scale for how rough and open the prepped slab is. Thin coatings and sealers sit low on it, and urethane cement and thick overlays want a deeper profile. We prep to the range on your data sheet and check it against profile chips.

Diamond grinding or shot blasting: which does my floor need?

Grinding gives a finer profile and handles high spots, thin coatings and mastic well. Shot blasting cuts a coarser texture fast across big open areas and suits heavy systems. Plenty of jobs use both, grinding the edges and blasting the field.

Can you take up old epoxy and paint?

Yes. Most failed coatings come off with heavy diamond grinding, and thick ones may need a scarifier first. Then we profile the concrete underneath so the new floor bonds to bare slab.

Why test for moisture if the slab looks dry?

Vapor moves up through on-grade slabs here all year, and it stays hidden until a coating blisters or lifts. Humidity probes or calcium chloride tests give us a number to plan around. A high reading means a vapor-control primer or a different system, which costs far less than tearing out a failed floor.

How much dust will grinding put in the building?

Very little, done right. Every grinder, blaster and scarifier we run is tied to an industrial vacuum, so the dust goes in bags. Occupied offices or kitchens can still be sealed off with plastic as an extra step.

Do you only prep floors you are coating?

No. We prep slabs for other installers, polishing crews and GCs who need a floor opened before tile or resilient flooring goes down. Send the spec and square footage and we will price the prep as its own scope.

Let’s look at your floor.

Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.

A phone number or an email is enough. The office answers within a working day.