Every Gretna floor gets the full grind
One slab takes forklifts, another takes bare feet by the pool. Around Gretna, we build each floor from the slab up, matched to the traffic and the water it will actually see. It sits in Jefferson Parish, about 1.8 miles northeast of Harvey.
Gretna, Jefferson Parish, Louisiana.
Where Gretna sits
Housing figures from the US Census.
Census numbers put the typical home in Gretna at about 1963. Plenty of Gulf houses from the 1960s went up on slabs poured over thin plastic sheeting or nothing at all. Moisture testing matters a lot here.
A slab can look dry in March and sweat through a fresh coating by August.
With a rental-heavy housing mix, the person living on the floor is often not the person paying for it. We talk to both and get the owner’s approval in writing before we start.
Gretna sits in Jefferson Parish, inside a stretch of Southeast Louisiana where a lot of ground lies at or below sea level and water management is a fact of every building. Around Jefferson Parish, the floor work is mostly this: harvey Canal shops, Metairie storefronts, Kenner kitchens and garages on both banks, close enough to start early and stay late. The nearest towns on our list range from Harvey (typical home around 1973) to Terrytown (around 1977); Gretna lands on the older side.
The metro mixes old and new, with raised cottages and shotgun doubles in the older neighborhoods, slab-on-grade ranch houses in the suburbs, and commercial kitchens and warehouses nearly everywhere you look.
It is a mix: about 59% stand-alone houses, the rest townhomes, condos, mobile homes and apartments. Some owners here have their own garage, and some share a building with neighbors. We quote both, and shared floors usually start with a conversation with the HOA or the manager.
Sweating floors
The New Orleans metro.
Gretna is in Jefferson Parish, about 1.8 miles northeast of the shop.
Heat and humidity hang on here for most of the year, and that air is full of water. On-grade slabs pick up moisture from below and from the air above, so a floor that looked dry in the morning can sweat by afternoon. Coatings laid over a damp slab without a moisture test are the ones that blister and peel a season later. We test first, and when vapor readings run high we spec a moisture-mitigating primer or a urethane cement that tolerates it.
For a restaurant or commercial kitchen in Gretna, urethane cement handles hot water, grease and daily washdown far better than a thin epoxy roll coat ever will.
If the building took water in a past storm, plan for full grinding and repair, since old flood residue under a new coating is how floors fail early.
Garage and patio owners should go with a flake or slip-resistant finish, because a glossy floor turns slick fast once humid air or tracked-in rain hits it.
Commercial and home floors
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Concrete Polishing
Mechanical grind and polish of the existing slab, densified and guarded, for showrooms, warehouses, restaurants and offices that want a bright floor.
Concrete Restoration
Spall, crack and joint repair, patching, re-leveling and coating removal that puts damaged or flooded slabs back to work.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Terrytown
1.5 miles away, Jefferson Parish
- Harvey
1.8 miles away, Jefferson Parish
- Timberlane
2.7 miles away, Jefferson Parish
- Marrero
4.1 miles away, Jefferson Parish
More in Jefferson Parish, on the services page and in the gallery.
Things to know first
Or send the plans first.
Got a slab question we did not cover? Call.
(504) 231-6298Do you come out to Gretna?
Yes. Gretna is about 1.8 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1963?
Look for plumbing patches, tack strip holes and glue under any carpet or tile. Each one adds prep time, and Dustin can tell you how much once he sees the floor.
Does the humidity change how long a floor takes to cure?
It can. Heat and humidity change cure times for epoxies and urethanes, and some products blush or cloud when the air is wrong. We pick products and time the coats around the conditions on the day, and we tell you when the floor is ready for traffic.
What finish suits an old slab in an older building?
Polished or honed concrete often suits an old slab if it is sound, because it shows the character of the concrete instead of covering it. Heavily patched or uneven slabs may need a micro-topping or an overlay first. We look at the floor before we recommend either.
Can a floor that flooded be coated again?
Usually, once the concrete is sound. We grind off the old coating, adhesive and contamination, repair cracks and spalls, and test moisture after the slab has had time to dry. If the concrete itself is damaged, it gets repaired before any coating goes down.
Can you work around a restaurant that cannot close for long?
That is a normal job here. We plan the grind, the build and the cure around your closed hours or a short shutdown, and some urethane cement systems take traffic sooner than many epoxies. Tell us your window and we will tell you straight whether it fits.
How should the floor look when Dustin arrives?
Clear enough to see bare concrete in a few spots. If the slab is under carpet or tile, pull back a corner where you can. Ten seconds of looking at the real surface tells us more than any description.
What can push a schedule back?
Moisture in the slab, surprises under old flooring and rain on outdoor jobs. We test early and look under the old floor during the visit, so most of that shows up before the dates are set.
What do I need to do before the crew shows up?
Clear the floor completely, including shelves, stored items and anything you want moved. Make sure the crew has access to power and water. After that, stay off the slab once prep starts.
After a flood, how soon can a floor be coated?
Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.
Pick your way in
Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.
Send the plans
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.