Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Heavy traffic and Livingston floors that take it

One slab takes forklifts, another takes bare feet by the pool. Around Livingston, we build each floor from the slab up, matched to the traffic and the water it will actually see. It sits in Livingston Parish, about 58 miles northwest of Harvey.

Livingston, Livingston Parish, Louisiana.

Homes and businesses here

Housing figures from the US Census.

Census numbers put the typical home in Livingston at about 1982. Garages from the eighties often have a clear sealer someone rolled on years ago. It is hard to see, but water beads on it, and a primer would too.

A grind takes it off, and a cleaner alone does not.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

Up in the Florida Parishes, Livingston sits in Livingston Parish, where pine and hardwood country mixes with fast-growing suburbs, small farm towns and horse pastures. Around Livingston Parish, the floor work is mostly this: new subdivisions, strip retail and homes rebuilt after the 2016 flood, many with slabs that need a moisture check before coating. The nearest towns on our list range from Albany (typical home around 1980) to Walker (around 1997); Livingston lands on the older side.

Flooding reaches farther north than people assume: the 2016 flood hit Livingston and Tangipahoa hard, and Katrina pushed surge from the lake into Slidell.

Stand-alone houses make up the bulk of it, roughly 74%. When nearly every home is a house, the driveway counts as a floor too. Concrete that has cracked or stained out front can be repaired and coated with something built for sun and rain.

Gulf air on bare concrete

The Northshore and the Florida Parishes.

Livingston is in Livingston Parish, about 58 miles northwest of the shop.

Summers are long, hot and wet, and afternoon storms dump heavy rain fast. Garages, patios and pool decks take the most punishment from hot tires, direct sun, pine straw and standing water at the edges. Outdoors, a UV-stable topcoat matters, since plain epoxy yellows and chalks in the sun. Lighter colors and textured finishes keep a pool deck cooler underfoot and safer to walk on barefoot when it is wet.

Pick a lighter color and a textured finish for a pool deck, so bare feet do not burn or slide when the deck gets wet.

For an equipment shed or farm shop in the country around Livingston, a broadcast system with coarse aggregate gives traction a smooth coat never will.

If you are building in Livingston, tell the builder you want the slab moisture tested before flooring, because tight schedules push coatings onto green concrete all the time.

Polish or coating

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

A rug pattern in red, blue and turquoise stained into a gray textured concrete porch floor

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Amber stained concrete with a gold fleur-de-lis set into the floor in front of a furniture display

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

Topcoat or guard, set to the traffic and the shine you want.

Body

The color and the thickness: epoxy, urethane cement, stain or an overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

The concrete as we find it. Moisture, old sealer and cracks decide everything above it.

The next towns over

More in Livingston Parish, on the services page and in the gallery.

Quick answers before a visit

Or send the plans first.

Want a straight answer today? Ring the office.

(504) 231-6298

Do you come out to Livingston?

Yes. Livingston is about 58 miles northwest of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1982?

It may have been through more than one big storm. We check the wall edges and low spots for water damage and salt before choosing a system.

What finish works best on a pool deck here?

A light-colored, textured system with a UV-stable topcoat, or a stamped overlay sealed for outdoor use. Both stay cooler and give grip when wet. Dark, glossy coatings get hot and slick, so we steer people away from them.

Can you coat the slab in a brand-new house?

Yes, once the concrete has cured enough to pass a moisture test. New slabs hold a lot of water, and coating too early is how floors blister. If the schedule is tight, a moisture-tolerant primer can let the work go ahead.

Do you build floors for schools, clinics and new retail?

Yes. Polished concrete, epoxy and slip-resistant coatings all fit those buildings, and we work to the general contractor’s schedule and submittals. Samples and product data are available on request.

Can an older slab in a farm town be polished?

If the concrete is sound and reasonably flat, yes. Old slabs often show aggregate, patches and stains once ground, and plenty of owners like that look. Badly damaged or uneven floors may need repair or a micro-topping first.

Can you work around our business hours?

Commercial jobs often run nights, weekends or inside a planned shutdown window. Tell us when the floor has to be back in service and we build the sequence backward from that date.

Should I clean the slab before you arrive?

Sweep it if you like, but the grinder does the real cleaning. Tell us about oil spots, chemical spills or anything soaked into the concrete so we can plan for it.

After a flood, how soon can a floor be coated?

Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.

Two ways to start

Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.

Send the plans

Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.