A Westbank flooring crew working Prairieville
One slab takes forklifts, another takes bare feet by the pool. Around Prairieville, we build each floor from the slab up, matched to the traffic and the water it will actually see. It sits in Ascension Parish, about 61 miles northwest of Harvey.
Prairieville, Ascension Parish, Louisiana.
Who lives and works in Prairieville
Housing figures from the US Census.
Half the homes in Prairieville are older than about 2002 and half are newer, according to the Census. Even a young slab cracks. Shrinkage cracks show up in the first year or two on most concrete, and by now they have mostly stopped moving.
We fill them so they disappear under a solid coating, or leave them as character in polished concrete if you like the look.
Around Baton Rouge the Mississippi is lined with refineries, chemical plants and terminals, and the shops, warehouses and contractors that serve them fill the roads behind the levee.
Most homes here are stand-alone houses, about 82 in every 100. Houses on their own slabs mean each owner decides on their own floor, with no board or manager to clear it with first.
Numbers like these are why we ask what the space is used for before we talk systems.
The August 2016 flood put water into homes and businesses across the capital area, including neighborhoods that had never flooded before. Around Ascension Parish, the floor work is mostly this: chemical plant support shops on the river, plus garages and patios in the fast-growing Prairieville and Gonzales subdivisions. Close by, typical homes run from about 1985 in Village St. George to 1993 in Port Vincent, and Prairieville sits on the newer side of that spread.
When the slab stays damp
The Baton Rouge area.
Prairieville is in Ascension Parish, about 61 miles northwest of the shop.
Refineries, petrochemical plants and the shops that serve them run along the river on both sides of Baton Rouge. Those floors take forklifts, drums, solvents and hot washdown, and a decorative coating does not last a month in that service. Urethane cement and chemical-resistant epoxy over a shot-blasted profile are the usual answer, built thick enough for what gets dropped. Plant work also comes with safety orientations, permits to work and turnaround dates, and we plan the grind and the cure inside them.
For a plant floor, tell us what rolls across it and what gets spilled on it, because wheel loads and chemicals decide both the resin and the thickness.
If the building took water in 2016, plan on pulling up whatever went down afterward and testing the concrete underneath before choosing a new system.
In a new subdivision house, wait until the slab tests dry or use a moisture-tolerant primer, since a fresh garage slab in this heat will blister a standard coating.
Which coating for which room
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
The finish you actually walk on, matched to the use.
Where the system gets its build: resin, cement or a decorative overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.
The next towns over
- Old Jefferson
5.3 miles away, East Baton Rouge Parish
- Shenandoah
6.7 miles away, East Baton Rouge Parish
- Port Vincent
7 miles away, Livingston Parish
- Village St. George
7.2 miles away, East Baton Rouge Parish
More in Ascension Parish, on the services page and in the gallery.
Questions about floors in Prairieville
Or send the plans first.
Easier to talk it through? Call the shop.
(504) 231-6298Do you come out to Prairieville?
Yes. Prairieville is about 61 miles northwest of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 2002?
It is likely dense and flat, and it may be post-tensioned. That makes it a strong candidate for polished concrete, as long as nobody cuts into the cables.
Can you redo a school or clinic floor without shutting the building down for long?
Usually, by phasing the work around the building’s hours or a break. We finished a teaching-kitchen floor for Firstline Schools in New Orleans inside a short summer window, and capital-area jobs get planned the same way. Tell us the dates and we will say straight whether the system fits.
Will your crew work inside a plant with permits and safety orientations?
Yes. Plant and government work comes with site safety rules, and we have worked under a strict safety officer on a government job. Send the scope, the chemical exposure and the shutdown dates, and we will price a system that fits them.
Can you redo a floor that went under in the 2016 flood?
Yes. We take off whatever was laid over it, grind the slab back to sound concrete and test it for moisture. Cracks, spalls and loose patches get repaired before the new system goes down.
Is Prairieville close enough for you to take the job?
Yes. The Baton Rouge area is inside the region we cover from Harvey, and we plan the drive so the crew gets full days on the floor. A contractor can send drawings, square footage and the schedule, or Dustin can come out and look at the slab.
Do I have to be there for the visit?
It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.
What can push a schedule back?
Moisture in the slab, surprises under old flooring and rain on outdoor jobs. We test early and look under the old floor during the visit, so most of that shows up before the dates are set.
Should I clean the slab before you arrive?
Sweep it if you like, but the grinder does the real cleaning. Tell us about oil spots, chemical spills or anything soaked into the concrete so we can plan for it.
After a flood, how soon can a floor be coated?
Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.
Start with the slab
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.