Quartz epoxy floors for wet, hard-working rooms
Colored quartz sand broadcast into epoxy, locked down with a clear coat. It gives a locker room, a kitchen or a lab a textured, sanitary floor that takes washdowns and still looks finished.
22 years in businessCoatings5.0 on Google from 36 reviews
What it is
Quartz epoxy is a broadcast system. We roll an epoxy body coat over a ground slab and throw colored quartz into it until the wet resin disappears under the sand. Quartz is fine, angular aggregate about the size of beach sand, colored at the factory and blended. Flake is a different animal: a vinyl chip that lies flat. Quartz is a mineral grain that stands up, so the cured floor has real tooth under a wet boot.
That texture is why it goes where it goes. Locker rooms, shower rooms, commercial kitchens, school cafeterias, labs, clinic corridors and patient restrooms: rooms that get hosed down and disinfected every shift and still have to look clean to an inspector. Most quartz floors go down with an integral cove base, so the floor runs up the wall a few inches and there is no seam at the corner for water and grime to sit in. The color blends hide wear and scuffs better than a solid coat ever will.
Against our other epoxy work: a solid-color epoxy floor is smooth and easy to keep shiny, and it gets slick when wet. Flake floors are built for garages and light commercial, where looks lead. Quartz is the one we spec when traction and sanitation lead and the room sees water all day. Where the room also sees boiling water, fryer grease or steam cleaning, that is urethane cement territory, and we will tell you so before you buy the wrong floor. Bring us the room and what happens in it, and Jacob or Dustin will tell you which one fits.
Part of our coatings work. See all of it.
Start with the concrete.
What goes down, from the surface you walk on to the slab under it.
The trap is a single thin broadcast to save a day; it wears through in the traffic lanes, and we would rather lose the job than install it.
Clear grout coat
A clear epoxy or urethane seal coat rolled over the sand, set thicker or thinner to dial in how much grip stays on top.
Double broadcast
Two epoxy body coats, each flooded with colored quartz to refusal.
Primer and cove
A penetrating epoxy primer, or a moisture-mitigating primer where the slab tests wet, plus troweled cove base at the walls.
Ground profile
We diamond grind or shot blast to an open profile, then fill cracks, spalls and the edges around floor drains before any resin goes down.
Slab as found
Often an existing slab with old adhesive, coatings, cracks and moisture coming up.
Where it belongs
Locker and shower rooms
Wet bare feet, soap film and daily disinfectant. The broadcast keeps traction and the cove keeps water off the wall line.
Commercial kitchens
Prep lines, dish rooms and walk-in thresholds where the floor gets hosed nightly and the health inspector looks at corners.
Labs
School science rooms and testing labs that need a nonporous floor able to stand up to spills and get wiped down all day.
Healthcare
Clinic restrooms, soiled utility rooms and corridors where infection control wants no grout lines and a floor that cleans fast.
How the crew runs it
Five steps, in order.
Look at the slab
Dustin or Jacob walks the room, checks moisture, drains and old coatings, and asks what gets spilled and how it gets cleaned.
Grind and repair
Grind to profile, vacuum it clean, and fill cracks and spalls so they do not telegraph through the sand.
Prime and cove
Primer goes down, then the cove base is troweled in by hand so the floor and wall become one piece.
Broadcast twice
Body coat, quartz to refusal, cure, sweep, repeat. Two broadcasts build thickness and an even color.
Seal and walk
The clear grout coat is rolled on, and we walk the finished floor with you before anyone moves equipment back in.
For the GC or the facility
- Send drawings, square footage and the shutdown window, and we price from the plans.
- Submittals, product data and color samples on request.
- The slab needs to be fully cured, moisture-tested and clean of curing compounds before we start; new concrete typically needs about 28 days.
- Foot traffic is typically the next day after the seal coat; carts and full service in two to three days, longer when the air is wet.
Gulf South conditions
Down here the first enemy is the slab itself. Plenty of older on-grade slabs in New Orleans and the river towns were poured without a vapor barrier, and with the water table this high, moisture keeps pushing up. Put epoxy over that without testing and it can blister and peel. We test, and when the numbers say wet, the system starts with a moisture-mitigating primer.
Then there is the air. In July a closed-up locker room can sit damp enough that the slab sweats, and resin will not bond to a wet surface. We run dehumidifiers and fans before we prime, watch the dew point, and schedule coats for the part of the day the room is driest. Humidity also slows cure, so we build that into the schedule we give you instead of promising a turnaround the weather will not allow.
Look at the finish.
“What set them apart was that they offered the product I actually wanted, not what was quickest or easiest for them.”
Jason Lagneaux, Google review5.0 on Google from 36 reviews
Living with it
Mop with a neutral or mildly alkaline cleaner and rinse; a deck brush or auto-scrubber gets into the texture where a string mop will not. Disinfectants are fine. Skip solvent strippers and wire brushes, and swap steel casters for rubber ones. If the texture starts to look worn in a traffic lane, we can sand and recoat the top without tearing out the floor.
Next to this one
See finished floorsQuestions about quartz epoxy flooring
See finished jobs in the gallery, or reach the office.
How is quartz different from flake?
Quartz is a hard mineral grain the size of sand, broadcast thick so it leaves texture on top. Flake is a thin vinyl chip that lies flat. For wet rooms and healthcare, quartz gives more grip and takes heavier cleaning.
Can we pick how rough the floor is?
Yes. The texture comes from the seal coat: a thinner coat leaves more sand exposed and more grip, a thicker one smooths it out and cleans more easily. We can make sample boards at two or three textures so the owner can stand on them before choosing.
Is quartz epoxy right for a restaurant hot line?
For the cold side, dish room and prep, it works well. Under fryers, kettles and combi ovens, where hot oil and boiling water hit the floor, we recommend urethane cement, because standard epoxy can soften and crack under that heat.
Do you install the cove base too?
Yes, and on most quartz jobs we recommend it. The cove is troweled from the same resin and quartz, usually four or six inches up the wall, so the corner cleans like the floor.
How long is the room out of service?
On a typical locker room or kitchen, plan on a few working days from first grind to seal coat, then roughly a day before foot traffic. Give us the shutdown window up front and we will tell you straight whether it fits.
Can quartz go over an old tile floor?
Not as a rule. Tile and old VCT come up and the adhesive gets ground off so the epoxy bonds to concrete. Over tile, the grout lines crack through and the new floor fails with them.
Let’s look at your floor.
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.