Urethane cement floors that take heat and hot water
The floor we put under fryers, kettles and steam hoses. Urethane cement goes down thick and stays bonded when boiling water and floor chemicals hit it every night.
22 years in businessCoatings5.0 on Google from 36 reviews
What it is
Think about the floor under a fryer bank at ten at night. Hot oil, then a steam hose, then a degreaser that would eat most coatings. Standard epoxy can soften and lift under that cycle. Urethane cement is built for it: urethane resin, cement and aggregate troweled down thick, usually a quarter inch or so, and it moves with heat closer to the way concrete does, so it stays bonded through thermal shock.
It also handles what plants spill: lactic acid from dairy, sugars and syrups, blood and fats in meat rooms, the caustic and acid washes sanitation crews run. Food and beverage plants, commissary kitchens, restaurant back-of-house, school kitchens and cooler and freezer rooms are where it earns its keep. It usually goes back into service fast, which matters when a kitchen is closed for a weekend. It is a working floor. It is supposed to look like one. The finish is matte and textured, usually in a handful of plain colors, and nobody puts it in a lobby.
People mix it up with urethane floor coatings, and the names do not help. A urethane coating is a thin film, a few mils, rolled over epoxy or concrete to protect it from sun and scuffing. Urethane cement is a troweled layer about a quarter inch thick. One is a topcoat. The other is the whole floor. We put a urethane floor down at a kitchen and bar for a general contractor, along with polished concrete on the same job, and it is a pairing we see often: polish where people walk, urethane where the hot water runs.
Part of our coatings work. See all of it.
Start with the concrete.
What goes down, from the surface you walk on to the slab under it.
We will not roll a thin coating under a fryer bank to hit a lower number; it lets go, and somebody pays for the floor twice.
Topcoat
A urethane cement topcoat seals the texture and gives the kitchen staff a surface they can squeegee dry.
Troweled body
Urethane cement mortar troweled out thick, with extra aggregate broadcast where the room needs more grip.
Keyed terminations
Saw-cut keyways at every edge, drain and doorway so the edges are locked into the slab.
Clean, open profile
Shot blast or grind to a heavy profile, and cut out oil-soaked concrete until what is left will bond.
Slab as found
Often a kitchen slab soaked with years of grease, under failed tile or an old coating.
Where it belongs
Restaurant hot lines
Under fryers, ranges, kettles and tilt skillets, where hot grease and boiling water land every shift.
Food and beverage plants
Processing rooms with sugars, acids, blood or fats on the floor and a hot caustic wash at the end of every shift.
Coolers and freezers
Walk-ins and cold rooms where carts roll from warm to freezing and the floor has to handle the swing.
Washdown areas
Dish rooms, can wash stations and trash rooms that get hosed with hot water and never really dry out.
How the crew runs it
Five steps, in order.
Walk the kitchen
We look at the slab, the drains and the slope, and ask what ends up on the floor and what sanitation cleans it with.
Strip and blast
Old tile and coatings come up, grease-soaked spots get cut out, and the slab is shot blasted or ground.
Cut the keys
Keyways are saw-cut at edges, drains and doors, and ponding spots get sloped to drain while the slab is open.
Trowel it down
The crew trowels the urethane cement out by hand, running cove base up the wall where the spec calls for it.
Topcoat and hand back
The topcoat goes on, and we tell the kitchen manager when carts, hot water and full cooking can start again.
For the GC or the facility
- Send the kitchen plan, drain and equipment layout, and the dates the space is dark.
- Product data, color chips and submittals on request.
- Equipment out and drains set at final height before we start.
- Typical turnaround: foot traffic the next day, hot water and heavy carts a day or two after, depending on the product and the temperature.
Gulf South conditions
A New Orleans kitchen is a hot, wet box most of the year. The slab under it is often old, sometimes poured long before anyone thought about a vapor barrier, and the high water table keeps moisture moving up from below. Urethane cement tolerates that moisture better than most epoxies, which is one reason it is the default for back-of-house work down here. Heat matters during the install too: in a hot building the mix goes off fast, so we batch small and work the cooler hours.
Storms add their own problem. A kitchen or plant that took water in a flood comes back with a dirty, wet slab and an owner who needed to reopen yesterday. We clean and dry it before we trowel anything, because a floor that lets go at the drains six months later means a second shutdown.
Look at the finish.
“What set them apart was that they offered the product I actually wanted, not what was quickest or easiest for them.”
Jason Lagneaux, Google review5.0 on Google from 36 reviews
Living with it
Scrub with a deck brush or auto-scrubber and the cleaners your sanitation program already uses; hot water is fine. Keep the drains clear so water does not sit in low spots. Do not drag equipment with bare steel feet across it, and call us if a section gets gouged, because a patch now beats a soaked slab later.
Next to this one
See finished floorsQuestions about urethane cement flooring
See finished jobs in the gallery, or book a slab visit.
Can we use regular epoxy in the kitchen instead?
Standard epoxy is fine on the cold side, but it can soften and crack where hot oil and boiling water hit it every night. Urethane cement is built for that heat and moves with the slab, so it stays bonded.
How thick does it go down?
Typically about a quarter inch for a troweled kitchen floor, thinner for a slurry system in lighter rooms. Thickness follows the abuse: more heat and heavier carts get more material. We put the build in writing on the quote.
What does it look like?
Plain, on purpose. It comes in a short list of solid colors with a matte, slightly textured finish. If the front of house needs to look good, we pair it with polished concrete or a decorative system out there.
Can you work around our restaurant’s schedule?
That is most of the job. Kitchens get done on closed days, overnight stretches or a planned shutdown, sometimes one section at a time so part of the line keeps running. Tell us when you are dark and we will build the schedule around it.
Does urethane cement smell during install?
Most urethane cement products are low odor compared with solvent coatings, but the space still needs ventilation and food prep stops while we work. We tell your team what to cover and when it is clear to reopen.
Is a urethane coating the same thing?
No. A urethane coating is a thin film, a few mils, usually rolled over epoxy as a UV and wear topcoat. Urethane cement is a thick, troweled floor of its own. If hot water and grease are the problem, you want the cement.
Let’s look at your floor.
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.