Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content
Gray seamless resin floor under stainless kitchen equipment and a vent hood in a commercial kitchen

Kitchen floors built for hot water, grease and long shifts

A restaurant line takes boiling water and harsh cleaners every night, and the cooks on it move fast in greasy shoes. We build floors for that, with the base coved up the wall so there is no seam for water to find.

22 years in businessCommercial5.0 on Google from 36 reviews

What it is

In most buildings, the kitchen is the room that is hardest on a floor. Fryers drip oil, steam kettles and dish machines dump water near boiling, and sanitizers and degreasers go down every closing shift. Cold walk-ins sit a few feet from hot lines. Vinyl lifts, quarry tile grout washes out and turns black, and a standard epoxy can soften and crack when hot water and thermal shock hit it day after day. Most kitchens we walk into already have one of those problems.

Urethane cement is what we reach for most. It is a cement-filled urethane, troweled or broadcast at about a quarter inch, built to take hot water, grease, cleaners and rolling racks without letting go. We texture it so a wet, greasy floor still has grip, and we run it up the wall as an integral cove base, which leaves no joint between floor and wall for food and water to sit in. Floor drains and trench drains get a clean, sealed edge, and where water stands we can slope the floor toward them.

The room decides the system. Most kitchens end up in urethane cement, with a slip-resistant texture where the line staff stand. Here the question is which build fits which kitchen: a school teaching kitchen with a summer deadline, a hotel banquet kitchen that never fully closes, a bar back that gets soaked behind the rail. We put down a teaching-kitchen floor for Firstline Schools at Samuel J Green School inside a short summer window before classes started, and a urethane floor at a kitchen and bar for a general contractor. Those are the rooms we plan this floor around.

Part of our commercial work. See all of it.

Gold and brown mottled stained concrete under a diner counter lined with chrome stools
Stained concrete, a restaurant.
Warm-toned polished concrete in a restaurant dining room with dark wood chairs and tables
Polished concrete, a restaurant.

Start with the concrete.

What goes down, from the surface you walk on to the slab under it.

We will not put a thin, smooth epoxy in a hot kitchen to save a few days; it cracks by the kettles and goes slick at the dish pit.

  1. Textured topcoat

    A sealed topcoat over broadcast aggregate gives a cook grip on a wet, greasy floor.

  2. Urethane cement body

    The body coat goes on at about a quarter inch, typical, to take heat, water and impact.

  3. Primer and cove

    A primer goes down, then the cove base is troweled up the wall in the same urethane cement.

  4. Profile and degrease

    Blasting or grinding opens the concrete, and oil-soaked spots get cut out or treated.

  5. Slab as found

    Often an older slab under quarry tile or vinyl, soaked with years of grease that has to be ground out.

Where it belongs

  • Restaurant lines and dish pits

    Fryer grease, boiling water and nightly scrubbing all land here, which is where urethane cement and a coved base earn their keep.

  • School kitchens

    The floor has to fit between the last day of school and the first, so we plan prep and cure around that calendar.

  • Hotel and banquet kitchens

    These run close to around the clock, so we phase the floor in sections and keep part of the kitchen cooking.

  • Bars and bar backs

    Ice wells, spilled drinks and wet mats make a slick strip behind the rail that needs texture.

How the crew runs it

Five steps, in order.

  1. Walk the kitchen

    We look at the slab, drains, walls and equipment, and get the shutdown dates from you or the GC.

  2. Pull and prep

    Old tile, vinyl or coating comes up, then the slab is ground or blasted under vacuum.

  3. Build the cove

    The cove goes up the wall first, to the height on the plans, tied into the floor as one continuous surface.

  4. Trowel and broadcast

    Urethane cement goes down at full thickness, then aggregate is broadcast for texture and locked in with a topcoat.

  5. Cure and hand back

    The floor cures before equipment rolls back in, and we walk it with the kitchen manager.

For the GC or the facility

  • Submittals, product data and a texture sample are available on request before we mobilize.
  • Most kitchen floors go in during a planned shutdown, so tell us the window and we will say if it fits.
  • Urethane cement typically takes foot traffic within about a day, with full service after full cure.
  • The slab has to be clear of tile, mastic and grease first, and we can handle that removal ourselves.

Gulf South conditions

Kitchens in the Gulf South fight humidity from both sides. The building air is wet most of the year, and older slabs under New Orleans restaurants often sit on grade with moisture moving up from below. A sweating slab under the wrong floor is how kitchen coatings bubble. Urethane cement tolerates more moisture in the slab than a lot of epoxies, which is one reason it fits here, but we still test first.

Hurricane season matters too. A kitchen that took water in a storm needs the old floor pulled and the slab checked before new coating goes on. And the heat never lets up: a line running in August with the back door propped open puts the floor through the same hot and wet swing as the dish room. Urethane cement handles that cycling far better than tile grout or vinyl.

Look at the finish.

Dark polished concrete floor in front of a backlit bar with stools and amber under-counter lighting
Polished concrete, a restaurant.

“Extraordinary Flooring completed 2 projects for me while I was managing projects for Hilton Worldwide. They were professional, coordinated their work with all operational activities, analytical and proactive when responding to difficult situations.”

Keith Faust, Google review5.0 on Google from 36 reviews

Living with it

Clean it like a kitchen gets cleaned: scrub with a degreaser and a deck brush or autoscrubber, rinse, and squeegee to the drain. Texture holds dirt if it only gets mopped, so scrub it. Do not drag equipment with steel feet across it, and call us before anyone cuts into the cove to run new plumbing.

Questions about commercial kitchen flooring

See finished jobs in the gallery, or drop the office a line.

Why urethane cement instead of epoxy in a kitchen?

Standard epoxy can soften and crack under boiling water and steam cleaning, and it does not like a damp slab. Urethane cement is made for hot water, grease and thermal shock, and it handles more moisture coming up from below. That makes it our first choice for a working kitchen.

What is an integral cove base?

It is the floor material troweled up the wall in a curve, so there is no seam where the floor meets the wall. Water and food have nowhere to collect, and the joint that would normally rot or grow mold is gone.

How slip-resistant can you make a kitchen floor?

We set the grip by how much aggregate we broadcast and how heavy the topcoat goes over it. More grip means more scrubbing, so we zone it: heavier at the fryers and dish pit, lighter in dry storage. We can lay out samples to walk on in kitchen shoes.

Can you work inside a school break or a short restaurant closure?

Yes. The Firstline Schools teaching kitchen at Samuel J Green School went in during a short summer window and was done before school started. For restaurants and hotels we can phase the room so part of the kitchen keeps cooking.

Do you remove the old quarry tile?

Yes, along with the setting bed and thinset. Tile removal often turns up soft or uneven concrete, so patching and leveling are part of the prep before urethane cement goes down.

How long before the kitchen can reopen?

It depends on the product and the room temperature. Urethane cement typically takes foot traffic within about a day and full service a little after that. You get the cure times from your product’s data sheet before we set the schedule.

Let’s look at your floor.

Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.

A phone number or an email is enough. The office answers within a working day.