Damp Harahan slabs and the primers that hold them
Commercial floors around Harahan take hot water, grease and wheeled traffic all day. Jacob Lawson’s crew has spent 22 years grinding slabs like these, and every job still starts at bare concrete. It sits in Jefferson Parish, about 8.8 miles west of Harvey.
Harahan, Jefferson Parish, Louisiana.
Homes and businesses here
Housing figures from the US Census.
Half the homes in Harahan are older than about 1970 and half are newer, according to the Census. A house slab from this time can be post-tensioned. The steel cables inside sit under heavy tension, so nobody drills or saw-cuts one without knowing where the tendons run.
Grinding and coating the surface is safe, and deep cuts are a separate conversation.
Commercial floor work around Harahan runs on tight windows, because a restaurant, a school or a store in this metro rarely gets to close its doors for long.
Most homes here are stand-alone houses, about 85 in every 100. When nearly every home is a house, the driveway counts as a floor too. Concrete that has cracked or stained out front can be repaired and coated with something built for sun and rain.
That mix decides who calls: owners redoing a garage or patio, landlords between tenants, or a business with a shop or a kitchen.
The metro mixes old and new, with raised cottages and shotgun doubles in the older neighborhoods, slab-on-grade ranch houses in the suburbs, and commercial kitchens and warehouses nearly everywhere you look. Around Jefferson Parish, the floor work is mostly this: harvey Canal shops, Metairie storefronts, Kenner kitchens and garages on both banks, close enough to start early and stay late. The nearest towns on our list range from Avondale (typical home around 1969) to Elmwood (around 1991); Harahan lands on the older side.
Humidity and the slab
The New Orleans metro.
Harahan is in Jefferson Parish, about 8.8 miles west of the shop.
The building stock runs from century-old commercial buildings with tired, patched slabs to suburban strip centers and new restaurants poured last year. Old slabs usually mean layers of tile mastic, paint and past repairs, plus joints that have moved. New slabs bring the opposite problem: they hold water while they cure, and flooring put down too early fails. Either way, prep decides the floor. Grinding to the right profile, filling joints properly and reading the moisture are most of the job.
For a restaurant or commercial kitchen in Harahan, urethane cement handles hot water, grease and daily washdown far better than a thin epoxy roll coat ever will.
If the building took water in a past storm, plan for full grinding and repair, since old flood residue under a new coating is how floors fail early.
Garage and patio owners should go with a flake or slip-resistant finish, because a glossy floor turns slick fast once humid air or tracked-in rain hits it.
Polish or coating
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Elmwood
1.5 miles away, Jefferson Parish
- Waggaman
1.7 miles away, Jefferson Parish
- River Ridge
1.9 miles away, Jefferson Parish
- Avondale
2.5 miles away, Jefferson Parish
More in Jefferson Parish, on the services page and in the gallery.
What people ask us
Or send the plans first.
Got a slab question we did not cover? Call.
(504) 231-6298Do you come out to Harahan?
Yes. Harahan is about 8.8 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1970?
Check whether it is post-tensioned before anyone drills or cuts. Grinding and coating are surface work and safe either way.
Can you work around a restaurant that cannot close for long?
That is a normal job here. We plan the grind, the build and the cure around your closed hours or a short shutdown, and some urethane cement systems take traffic sooner than many epoxies. Tell us your window and we will tell you straight whether it fits.
How do you handle moisture coming up through older metro slabs?
We test the slab before we quote a system. When vapor readings are high, we use a moisture-mitigating primer or a urethane cement built for it instead of hoping a standard epoxy holds. That test costs far less than tearing out a failed floor.
Does the humidity change how long a floor takes to cure?
It can. Heat and humidity change cure times for epoxies and urethanes, and some products blush or cloud when the air is wrong. We pick products and time the coats around the conditions on the day, and we tell you when the floor is ready for traffic.
Do you take commercial floor work in Harahan?
Yes. The crew is based in Harvey and covers the New Orleans metro, from restaurants and schools to warehouses and plants. A general contractor can send drawings, square footage and the schedule, or Dustin can come out and look at the slab.
How should the floor look when Dustin arrives?
Clear enough to see bare concrete in a few spots. If the slab is under carpet or tile, pull back a corner where you can. Ten seconds of looking at the real surface tells us more than any description.
Can you work around our business hours?
Commercial jobs often run nights, weekends or inside a planned shutdown window. Tell us when the floor has to be back in service and we build the sequence backward from that date.
Should I clean the slab before you arrive?
Sweep it if you like, but the grinder does the real cleaning. Tell us about oil spots, chemical spills or anything soaked into the concrete so we can plan for it.
Does hurricane season change the schedule?
Indoor work goes on as normal. Outdoor jobs and anything with a long cure get planned around the forecast, and if a storm is coming we would rather move the date than rush a coating.
Two ways to start
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.