Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

What we put down on Purvis concrete

One slab takes forklifts, another takes bare feet by the pool. Around Purvis, we build each floor from the slab up, matched to the traffic and the water it will actually see. It sits in Lamar County, about 95 miles northeast of Harvey.

Purvis, Lamar County, Mississippi.

What kind of place Purvis is

Housing figures from the US Census.

The median home in Purvis was built around 1975, by the Census count. Additions and enclosed carports are common on houses this age, so one room can sit on a slab poured decades after the rest. The two pours rarely match in height or moisture.

We grind, patch the seam and treat them as two slabs until the coating ties them together.

The rest of the Pine Belt leans on timber, mills, small industry and farming, with older brick downtowns and newer houses spread out along the highways.

Stand-alone houses make up the bulk of it, roughly 86%. Single-family homes dominate, so most floor work starts in a garage or out back. Commercial floors in a place like this tend to be shops, restaurants and small offices.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

Purvis is in Lamar County, Mississippi, in the Pine Belt, where pine timber, red clay roads and loaded log trucks have been part of the scenery for generations. Around Lamar County, the floor work is mostly this: garages in new subdivisions, clinics, schools and retail along the highway, mostly on young concrete that needs a moisture test.

Vapor before primer

The Pine Belt.

Purvis is in Lamar County, about 95 miles northeast of the shop.

Summers here run long, hot and damp, and afternoon storms dump heavy rain in a hurry. Slabs on grade pick up moisture from the ground, and a building closed up through a humid spell can have a floor that sweats. That is how a garage coating or a gym floor starts to blister. We test the slab before we pick anything, and when the readings are high the build starts with a moisture-tolerant primer or urethane cement.

Book a school or campus floor into a break between terms, since the grind, the build and the cure need empty rooms to run without stopping.

Plan a hospital or clinic floor with the infection control team early, because the work zone, dust control and cure times all have to suit a building that never closes.

Before filling a crack in an older slab, have it checked for movement, since a rigid filler in a crack that still moves will open right back up.

Our picks for Purvis

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Light cream concrete overlay under an open steel pavilion leading to a wood-sided building

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Glossy blue-green stained concrete reflecting a row of colored window panels in a commercial room

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

Topcoat or guard, set to the traffic and the shine you want.

Body

The color and the thickness: epoxy, urethane cement, stain or an overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

The concrete as we find it. Moisture, old sealer and cracks decide everything above it.

The next towns over

More in Lamar County, on the services page and in the gallery.

Common questions

Or send the plans first.

Got a slab question we did not cover? Call.

(504) 231-6298

Do you come out to Purvis?

Yes. Purvis is about 95 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1975?

Check whether it is post-tensioned before anyone drills or cuts. Grinding and coating are surface work and safe either way.

Can you work in a school or university building between terms?

Yes. Breaks between terms are when most campus and school floors get done, since the grind is loud and dusty and the cure needs empty rooms. Book the dates early so the crew and materials are lined up before students leave.

What floor works in a sawmill shop or timber equipment barn?

A thick troweled epoxy, urethane cement or heavy broadcast system over a ground or shot-blasted slab. Mud, chain, hydraulic oil and steel tracks wear through thin coatings fast. Coarse texture keeps it walkable when it is wet.

Why do cracks keep coming back in Pine Belt slabs?

Often the crack is still moving, from the ground underneath or from the slab itself. A rigid filler cannot follow that movement, so it breaks loose. We check the crack, then choose a semi-rigid or flexible repair and carry it through the coating system.

Do I have to be there for the visit?

It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.

How long does a typical floor take?

A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.

Do I need to remove the old flooring myself?

No. Pulling carpet, tile or glue is part of our prep, and it is priced in. Some owners pull carpet themselves to save time, which is fine as long as the tack strips and pad come up too.

My slab sweats in the summer. Is that a problem?

It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.

Pick your way in

Five minutes on the phone usually tells us whether it is a grind and seal, a coating or a polish.

Send the plans

Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.