Plant floors to porches across Lockport
Concrete in Lockport has to live with heat, wet air and hard use. Our crew drives out from the Westbank, grinds the slab to clean concrete and builds the floor up from there, layer by layer. It sits in Lafourche Parish, about 33 miles southwest of Harvey.
Lockport, Lafourche Parish, Louisiana.
Where Lockport sits
Housing figures from the US Census.
Half the homes in Lockport are older than about 1968 and half are newer, according to the Census. Carpet went down over a lot of 1960s slabs in later years, leaving tack strip holes along every wall and pad glue in the middle. The holes get filled and the glue comes off with the grinder.
Small damage like that can add a day to the prep.
Shop floors across the bayou parishes take a beating from steel, hydraulic oil and heavy parts, while homes and businesses want a floor that comes through the next high water. Around Lafourche Parish, the floor work is mostly this: shipyard and fabrication floors down the bayou, oilfield shops near Fourchon, and homes and schools from Thibodaux to Cut Off.
The work here runs on oilfield service, shipyards, boat builders and seafood, plus the shops, warehouses and offices behind them, from Houma and Thibodaux down toward the coast.
Stand-alone houses make up the bulk of it, roughly 74%. Single-family homes dominate, so most floor work starts in a garage or out back. Commercial floors in a place like this tend to be shops, restaurants and small offices.
Numbers like these are why we ask what the space is used for before we talk systems.
Sweating floors
Bayou Lafourche and Terrebonne.
Lockport is in Lafourche Parish, about 33 miles southwest of the shop.
Hurricane Ida came ashore at Port Fourchon in 2021 and ran north through these parishes, and surge has reached the lower bayou towns many times before that. Floors in flooded buildings need the old finish stripped and the contamination ground out. Cracks and joints get repaired, and the slab has to dry and pass a test before anything new goes on. Rushing a coating onto a wet, dirty slab after a storm is a reliable way to pay for the floor twice.
In a shop or yard near Lockport, pick a troweled or heavy broadcast system, because welding spatter and dropped parts chew through thin coatings fast.
Test slab moisture before any coating goes down, since the high water table under bayou country will find any primer that was not built for it.
Run cove base and sealed joints in kitchens and seafood rooms, because water left standing where the floor meets the wall is where bacteria and failures start.
Commercial and home floors
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Lockport Heights
1.5 miles away, Lafourche Parish
- Mathews
3 miles away, Lafourche Parish
- Bourg
7.5 miles away, Terrebonne Parish
- Raceland
8.1 miles away, Lafourche Parish
More in Lafourche Parish, on the services page and in the gallery.
Things to know first
Or send the plans first.
Still unsure? Dustin or Jacob will tell you straight.
(504) 231-6298Do you come out to Lockport?
Yes. Lockport is about 33 miles southwest of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1968?
Many slabs from the 1960s sit on little or no vapor barrier, so moisture testing comes first. Old vinyl tile and black mastic from that decade also get tested for asbestos before we grind.
Do you put down floors in seafood processing rooms and commercial kitchens?
Yes. Those rooms need urethane cement, cove base up the walls and a textured surface that keeps its grip when wet. Urethane cement handles hot water washdown and cleaning chemicals that would soften many epoxies.
Can you redo a floor after storm flooding?
Yes, once the slab has dried and been tested. We grind off the old finish and contamination, repair cracks and spalls, then install the new system. If the building is waiting on other repairs, we fit the floor into that schedule.
Why do garage floor coatings peel in bayou country?
Moisture coming up through the slab is the usual cause, along with poor prep. Water vapor pushes on a coating from below until it lets go. We grind the slab and test moisture first, then use a primer rated for the readings.
Which details help you put a quote together?
The size of the area, what the floor has to handle and when you need it back. For commercial work, add the specs, the shutdown window and any submittal requirements. From there we come back with a price.
How long does a typical floor take?
A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.
Do I need to remove the old flooring myself?
No. Pulling carpet, tile or glue is part of our prep, and it is priced in. Some owners pull carpet themselves to save time, which is fine as long as the tack strips and pad come up too.
Is there a best time of year for an outdoor coating?
Spring and fall usually give the most dry days and milder heat. Outdoor work happens in summer too, and we watch the radar and pick days without afternoon storms in the forecast.
Pick your way in
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.