Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Getting Galliano slabs ready for a coating

Call it 34 miles southwest of Harvey from our door to Galliano. The crew makes that drive with everything a commercial or residential floor needs, and the slab gets ground before anything goes on it.

Galliano, Lafourche Parish, Louisiana.

Census facts for Galliano

Housing figures from the US Census.

The median home in Galliano was built around 1981, by the Census count. Garages from the eighties often have a clear sealer someone rolled on years ago. It is hard to see, but water beads on it, and a primer would too.

A grind takes it off, and a cleaner alone does not.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

A floor in Galliano has to handle a high water table pushing moisture into on-grade slabs, on top of the humidity that comes with living among bayous and marsh. Around Lafourche Parish, the floor work is mostly this: shipyard and fabrication floors down the bayou, oilfield shops near Fourchon, and homes and schools from Thibodaux to Cut Off.

Lafourche Parish is bayou country, and Galliano shares what that means for a building: water close at hand, ground that stays damp, and storms that can roll straight in off the Gulf.

Stand-alone houses make up the bulk of it, roughly 71%. In a community of mostly houses, the interior slab under old carpet or tile is worth a look. Ground and polished, it makes a hard floor that stays cool underfoot through Gulf summers.

Water coming up from below

Bayou Lafourche and Terrebonne.

Galliano is in Lafourche Parish, about 34 miles southwest of the shop.

Shipyards, fabrication shops and oilfield service buildings put floors through welding slag, dropped steel, forklift wheels and spilled oil. Thin roll-on coatings do not last in that service. Troweled epoxy, urethane cement and heavy broadcast systems over a shot-blasted profile hold up far longer. Older homes and businesses along the bayous bring their own trouble: patched slabs, additions poured at different times, and floors that have already been under water once.

Run cove base and sealed joints in kitchens and seafood rooms, because water left standing where the floor meets the wall is where bacteria and failures start.

Test slab moisture before any coating goes down, since the high water table under bayou country will find any primer that was not built for it.

In a shop or yard near Galliano, pick a troweled or heavy broadcast system, because welding spatter and dropped parts chew through thin coatings fast.

Floors that fit Galliano

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Terracotta stamped brick-pattern overlay across a fenced patio with potted plants

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Glossy blue-green stained concrete reflecting a row of colored window panels in a commercial room

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

The finish you actually walk on, matched to the use.

Body

Where the system gets its build: resin, cement or a decorative overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.

The next towns over

More in Lafourche Parish, on the services page and in the gallery.

Your slab, your questions

Or send the plans first.

Easier to talk it through? Call the shop.

(504) 231-6298

Do you come out to Galliano?

Yes. Galliano is about 34 miles southwest of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1981?

Find out if it is post-tensioned. We grind only the surface and locate the cables before any cut or anchor.

What floor works in a shipyard or fabrication shop?

A thick system over a shot-blasted slab, such as troweled epoxy, urethane cement or a heavy broadcast build. These take impact, heat and oil that would wreck a thin coating. We size the thickness to what gets dropped and dragged across the floor.

How long before people and trucks can use a new floor?

It depends on the system and the temperature. Foot traffic often comes the next day, while vehicles and heavy loads usually wait several days for a full cure. We give you the actual times for the product we install.

Do you put down floors in seafood processing rooms and commercial kitchens?

Yes. Those rooms need urethane cement, cove base up the walls and a textured surface that keeps its grip when wet. Urethane cement handles hot water washdown and cleaning chemicals that would soften many epoxies.

Which details help you put a quote together?

The size of the area, what the floor has to handle and when you need it back. For commercial work, add the specs, the shutdown window and any submittal requirements. From there we come back with a price.

Will the whole floor be out of service at once?

Not always. Larger floors can be done in sections so part of the building stays open, with the order planned around traffic. It takes longer overall, and nobody has to shut down completely.

Do I need to remove the old flooring myself?

No. Pulling carpet, tile or glue is part of our prep, and it is priced in. Some owners pull carpet themselves to save time, which is fine as long as the tack strips and pad come up too.

After a flood, how soon can a floor be coated?

Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.

Call it in or send the plans

Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.

Send the plans

Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.