Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Plant floors to porches across Killona

Twenty-two years on grinders taught Jacob Lawson one thing about Gulf concrete: it holds water. Floors in Killona get a moisture check before a primer is chosen, because that call decides whether a coating stays down. It sits in St. Charles Parish, about 26 miles west of Harvey.

Killona, St. Charles Parish, Louisiana.

Where Killona sits

Housing figures from the US Census.

Census numbers put the typical home in Killona at about 1987. Expect a mix. An eighties slab may have carpet in one room, tile in the kitchen and sheet vinyl in a bath, each with its own glue.

Each section gets its own prep, then the whole floor gets ground to one even profile.

Floor work around Killona often answers to industrial standards, since plant owners and their contractors expect submittals, safety plans and work that fits inside a shutdown window. Around St. Charles Parish, the floor work is mostly this: plant control rooms, maintenance shops and warehouses on the river, plus garages and patios in Luling, Destrehan and St. Rose.

Homes along the corridor range from older raised houses near the levee to newer slab-on-grade subdivisions set back from the river, so residential slabs vary as much as the commercial ones.

Stand-alone houses make up the bulk of it, roughly 81%. In a community of mostly houses, the interior slab under old carpet or tile is worth a look. Ground and polished, it makes a hard floor that stays cool underfoot through Gulf summers.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

Sun on outdoor slabs

The River Parishes.

Killona is in St. Charles Parish, about 26 miles west of the shop.

Plant and refinery floors along the river see chemical spills, hot washdowns, forklifts and steel wheels, sometimes all in one room. A decorative epoxy will not last in that service. Urethane cement, chemical-resistant novolac epoxies and thick troweled systems are built for it, and they need a properly ground or shot-blasted profile to bond. We match the system to what actually lands on the floor, so the first thing we ask a plant for is its chemical list.

On older commercial slabs, plan time for removing what is already there, because old coatings and mastic are often the biggest part of the job.

If a plant floor in Killona sees chemicals, hand us the list of what gets spilled, because that list decides which resin we spec for the room.

Book floor work into a turnaround or shutdown window early, since the crew, the materials and the cure time all have to fit inside dates the plant sets.

Commercial and home floors

Gray seamless resin floor under stainless kitchen equipment and a vent hood in a commercial kitchen

Industrial Flooring

Plants, process areas, shops and support buildings along the river and coast, zoned by use and installed around shutdown windows.

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Terracotta stamped brick-pattern overlay across a fenced patio with potted plants

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

How any floor here gets built

The same order on every job, whatever the system.

Surface

Topcoat or guard, set to the traffic and the shine you want.

Body

The color and the thickness: epoxy, urethane cement, stain or an overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

The concrete as we find it. Moisture, old sealer and cracks decide everything above it.

The next towns over

  • Taft

    2.1 miles away, St. Charles Parish

  • Montz

    2.4 miles away, St. Charles Parish

  • Edgard

    4.3 miles away, St. John the Baptist Parish

  • Hahnville

    4.4 miles away, St. Charles Parish

More in St. Charles Parish, on the services page and in the gallery.

What people ask us

Or send the plans first.

Rather ask a person? The office picks up.

(504) 231-6298

Do you come out to Killona?

Yes. Killona is about 26 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1987?

Slabs from the 1980s are often dense from power troweling, which polishes well and needs a good grind before any coating. Carpet glue and thinset are the usual leftovers.

Do you work at plants and refineries along the river?

Yes. Industrial and plant floors are a big part of what we do, and we work to whatever safety rules and work permits the site requires. Send the scope, the chemical exposure and the shutdown dates, and we will price a system that fits.

What floor holds up to chemical spills?

Urethane cement and chemical-resistant epoxies, installed thick over a properly prepared slab. Which one depends on the chemicals, the temperatures and the cleaning routine. We match the resin to your exposure list rather than guessing.

Is Killona inside your service area?

Yes. The River Parishes sit well inside the area we cover from Harvey on the Westbank. Dustin can set a time to come look at the floor, or a contractor can send plans and the schedule.

Can you finish a floor during a short plant shutdown?

Often, if we plan it before the shutdown starts. We stage materials, run grinding and coating back to back, and pick systems whose cure fits the dates. If the window is too tight for the system you need, we say so up front.

How should the floor look when Dustin arrives?

Clear enough to see bare concrete in a few spots. If the slab is under carpet or tile, pull back a corner where you can. Ten seconds of looking at the real surface tells us more than any description.

How long does a typical floor take?

A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.

Do I need to remove the old flooring myself?

No. Pulling carpet, tile or glue is part of our prep, and it is priced in. Some owners pull carpet themselves to save time, which is fine as long as the tack strips and pad come up too.

My slab sweats in the summer. Is that a problem?

It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.

Pick your way in

Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.

Send the plans

Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.