Old glue up, new floor down in Romeville
Gulf humidity pays no attention to lines on a map, and Romeville, 47 miles west of Harvey, gets the same sweating slabs we see at home. We test, grind and pick primers to match.
Romeville, St. James Parish, Louisiana.
How Romeville is built
Housing figures from the US Census.
A 1980s slab anywhere in the Gulf South has probably been through several named storms. Look at the bottom of the walls for water lines, salt bloom or a patched section where a wall was opened up.
Those spots get extra grinding and a moisture check before we commit to a system.
Single-family homes dominate, so most floor work starts in a garage or out back. Commercial floors in a place like this tend to be shops, restaurants and small offices.
We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.
Homes along the corridor range from older raised houses near the levee to newer slab-on-grade subdivisions set back from the river, so residential slabs vary as much as the commercial ones. Around St. James Parish, the floor work is mostly this: process plant and terminal floors along the river, farm shops in the cane, and homes in Lutcher, Gramercy and Vacherie.
Floor work around Romeville often answers to industrial standards, since plant owners and their contractors expect submittals, safety plans and work that fits inside a shutdown window.
Sun on outdoor slabs
The River Parishes.
Romeville is in St. James Parish, about 47 miles west of the shop.
Hurricane Ida hit the River Parishes hard in 2021, and storms here bring wind damage, roof leaks and standing water inside buildings never meant to flood. Many older commercial buildings in the river towns sit on slabs that have been patched, tiled over and repainted for decades. Before a new floor, that history comes off with grinding or shot blasting. Cracks get routed and filled, and joints get treated so they do not telegraph through the new finish.
Book floor work into a turnaround or shutdown window early, since the crew, the materials and the cure time all have to fit inside dates the plant sets.
Homeowners around Romeville with a garage or shop slab should moisture test before coating, since river-country ground keeps on-grade concrete damp longer than most people expect.
On older commercial slabs, plan time for removing what is already there, because old coatings and mastic are often the biggest part of the job.
Commercial and home floors
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Convent
3.7 miles away, St. James Parish
- St. James
3.7 miles away, St. James Parish
- Welcome
3.8 miles away, St. James Parish
- Union
3.9 miles away, St. James Parish
More in St. James Parish, on the services page and in the gallery.
Things to know first
Or send the plans first.
Rather ask a person? The office picks up.
(504) 231-6298Do you come out to Romeville?
Yes. Romeville is about 47 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
Is Romeville inside your service area?
Yes. The River Parishes sit well inside the area we cover from Harvey on the Westbank. Dustin can set a time to come look at the floor, or a contractor can send plans and the schedule.
Can you finish a floor during a short plant shutdown?
Often, if we plan it before the shutdown starts. We stage materials, run grinding and coating back to back, and pick systems whose cure fits the dates. If the window is too tight for the system you need, we say so up front.
Do you work at plants and refineries along the river?
Yes. Industrial and plant floors are a big part of what we do, and we work to whatever safety rules and work permits the site requires. Send the scope, the chemical exposure and the shutdown dates, and we will price a system that fits.
What floor holds up to chemical spills?
Urethane cement and chemical-resistant epoxies, installed thick over a properly prepared slab. Which one depends on the chemicals, the temperatures and the cleaning routine. We match the resin to your exposure list rather than guessing.
Will the whole floor be out of service at once?
Not always. Larger floors can be done in sections so part of the building stays open, with the order planned around traffic. It takes longer overall, and nobody has to shut down completely.
Where do furniture, cars and equipment go?
Everything comes out of the work area, and cars stay out until the coating cures. For a plant or a kitchen, plan where the equipment sits during the job and when it comes back.
After a flood, how soon can a floor be coated?
Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.
Do I have to be there for the visit?
It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.
Pick your way in
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.