Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Getting St. Rose slabs ready for a coating

With St. Rose sitting 15 miles west of Harvey, a site visit is a normal day for us. Dustin looks at the slab and asks about traffic and timing, then Jacob’s crew takes it from there.

St. Rose, St. Charles Parish, Louisiana.

A look at St. Rose

Housing figures from the US Census.

Census numbers put the typical home in St. Rose at about 1985. Carpet glue is the big one on 1980s floors. Most of it scrapes and grinds off clean, leaving a slab that is ready for a coating or polish after crack repair.

The tack strip holes along the walls get filled either way.

It is a mix: about 64% stand-alone houses, the rest townhomes, condos, mobile homes and apartments. In the middle of the housing range, floor work splits between homeowner projects and the common areas of multifamily buildings.

Numbers like these are why we ask what the space is used for before we talk systems.

Homes along the corridor range from older raised houses near the levee to newer slab-on-grade subdivisions set back from the river, so residential slabs vary as much as the commercial ones. Around St. Charles Parish, the floor work is mostly this: plant control rooms, maintenance shops and warehouses on the river, plus garages and patios in Luling, Destrehan and St. Rose.

The corridor is plant country, with refineries, chemical plants and grain elevators lining the river roads alongside the shops, warehouses and contractors that keep them running.

What the weather does to a slab

The River Parishes.

St. Rose is in St. Charles Parish, about 15 miles west of the shop.

Plant and refinery floors along the river see chemical spills, hot washdowns, forklifts and steel wheels, sometimes all in one room. A decorative epoxy will not last in that service. Urethane cement, chemical-resistant novolac epoxies and thick troweled systems are built for it, and they need a properly ground or shot-blasted profile to bond. We match the system to what actually lands on the floor, so the first thing we ask a plant for is its chemical list.

Rose with a garage or shop slab should moisture test before coating, since river-country ground keeps on-grade concrete damp longer than most people expect.

If a plant floor in St. Rose sees chemicals, hand us the list of what gets spilled, because that list decides which resin we spec for the room.

On older commercial slabs, plan time for removing what is already there, because old coatings and mastic are often the biggest part of the job.

Homeowners around St. Rose with a garage or shop slab should moisture test before coating, since river-country ground keeps on-grade concrete damp longer than most people expect.

Systems that hold up here

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

A rug pattern in red, blue and turquoise stained into a gray textured concrete porch floor

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Glossy blue-green stained concrete reflecting a row of colored window panels in a commercial room

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

The finish you actually walk on, matched to the use.

Body

Where the system gets its build: resin, cement or a decorative overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.

The next towns over

  • Ama

    1.6 miles away, St. Charles Parish

  • Destrehan

    2.8 miles away, St. Charles Parish

  • Kenner

    4.5 miles away, Jefferson Parish

  • New Sarpy

    4.7 miles away, St. Charles Parish

More in St. Charles Parish, on the services page and in the gallery.

Your slab, your questions

Or send the plans first.

Rather ask a person? The office picks up.

(504) 231-6298

Do you come out to St. Rose?

Yes. St. Rose is about 15 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1985?

Clear sealers were common on garages then, and they are hard to spot. If water beads on the floor, there is a sealer, and it has to be ground off before a primer will hold.

Is St. Rose inside your service area?

Yes. The River Parishes sit well inside the area we cover from Harvey on the Westbank. Dustin can set a time to come look at the floor, or a contractor can send plans and the schedule.

What do you do about moisture in river-country slabs?

We test every slab before we spec a system. High vapor readings call for a moisture-mitigating primer or urethane cement, both of which tolerate conditions that make a standard epoxy blister.

Do you work at plants and refineries along the river?

Yes. Industrial and plant floors are a big part of what we do, and we work to whatever safety rules and work permits the site requires. Send the scope, the chemical exposure and the shutdown dates, and we will price a system that fits.

Do you take residential work along the river?

Yes, garages, patios, shops and interiors. Homeowners get the same moisture test and grinding a commercial floor gets, because the slab does not care who owns it.

Which details help you put a quote together?

The size of the area, what the floor has to handle and when you need it back. For commercial work, add the specs, the shutdown window and any submittal requirements. From there we come back with a price.

How long does a typical floor take?

A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.

Where do furniture, cars and equipment go?

Everything comes out of the work area, and cars stay out until the coating cures. For a plant or a kitchen, plan where the equipment sits during the job and when it comes back.

Can you coat floors in St. Rose in the middle of summer?

Yes, with some adjustments. Heat shortens working time, so the crew mixes smaller batches and may start early in the day. Humidity matters most for the slab underneath, which we test either way.

Call it in or send the plans

Five minutes on the phone usually tells us whether it is a grind and seal, a coating or a polish.

Send the plans

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.