Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Ground down and built back up in Agricola

Gulf humidity pays no attention to lines on a map, and Agricola, 112 miles northeast of Harvey, gets the same sweating slabs we see at home. We test, grind and pick primers to match.

Agricola, George County, Mississippi.

Getting to Agricola

Housing figures from the US Census.

Census numbers put the typical home in Agricola at about 1993. Laminate and floating floors from this era leave little behind, sometimes just a foam pad and a few strips of tape. That makes these some of the easiest slabs to polish.

A clean slab under a floating floor can be ready for grinding the same day it is uncovered.

Floors in Agricola deal with long humid summers, heavy rain and the occasional Gulf storm that arrives still carrying plenty of wind and water.

Most homes here are stand-alone houses, about 85 in every 100. Most people here live in houses, which puts carports, back patios and garage floors near the top of the list.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

Agricola is in George County, Mississippi, in the Pine Belt, where pine timber, red clay roads and loaded log trucks have been part of the scenery for generations. Around George County, the floor work is mostly this: equipment and farm shops, garages on homes set on acreage, and town buildings and churches around Lucedale.

Gulf air on bare concrete

The Pine Belt.

Agricola is in George County, about 112 miles northeast of the shop.

Katrina crossed the Pine Belt in 2005 with hurricane-force wind far inland and knocked down timber across the region, and tornadoes have torn through Hattiesburg and nearby towns since. Up here, storms mean roof leaks, broken windows and water inside buildings more often than surge. A floor that got wet from above needs the same care as one that flooded: old finish off, cracks repaired, moisture tested, then the new system.

Before filling a crack in an older slab, have it checked for movement, since a rigid filler in a crack that still moves will open right back up.

For a mill or timber equipment shop, go thick with a troweled or broadcast system, because skidder parts, chain and mud wear out roll-on coatings in a season.

Plan a hospital or clinic floor with the infection control team early, because the work zone, dust control and cure times all have to suit a building that never closes.

Good picks for this community

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

A rug pattern in red, blue and turquoise stained into a gray textured concrete porch floor

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Amber stained concrete with a gold fleur-de-lis set into the floor in front of a furniture display

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

Topcoat or guard, set to the traffic and the shine you want.

Body

The color and the thickness: epoxy, urethane cement, stain or an overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

The concrete as we find it. Moisture, old sealer and cracks decide everything above it.

The next towns over

  • Hurley

    11 miles away, Jackson County

  • Wade

    13 miles away, Jackson County

  • Big Point

    16 miles away, Jackson County

  • Benndale

    17 miles away, George County

More in George County, on the services page and in the gallery.

Quick answers before a visit

Or send the plans first.

Got a slab question we did not cover? Call.

(504) 231-6298

Do you come out to Agricola?

Yes. Agricola is about 112 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1993?

Garage slabs from that decade often have hot-tire marks in an old sealer. We grind through the sealer and use a primer that bonds to bare concrete.

Can you work in a school or university building between terms?

Yes. Breaks between terms are when most campus and school floors get done, since the grind is loud and dusty and the cure needs empty rooms. Book the dates early so the crew and materials are lined up before students leave.

Do you put down floors in hospitals and medical offices around Agricola?

Yes, healthcare is one of the kinds of work we take first. Those floors need easy cleaning, slip resistance and often cove base, and the work has to fit the facility’s infection control rules and hours. Samples and product data are available for submittals.

Does the humidity in Agricola change how a garage floor goes down?

It can. High humidity over a cool slab means condensation, and some coatings cloud or lose adhesion when that happens. We check the dew point and the slab temperature on the day and time the coats around them.

Why do cracks keep coming back in Pine Belt slabs?

Often the crack is still moving, from the ground underneath or from the slab itself. A rigid filler cannot follow that movement, so it breaks loose. We check the crack, then choose a semi-rigid or flexible repair and carry it through the coating system.

Do I have to be there for the visit?

It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.

How long does a typical floor take?

A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.

Is there anything to do for a commercial floor before you start?

Send the submittal requirements and any site safety rules early. Have equipment moved, drains and doorways marked and the area closed to other trades while we work.

What does humidity do to a fresh coating?

Put down at the wrong moment, some coatings can turn cloudy or stay tacky at the surface. We read the dew point and slab temperature before we mix, and we hold off when the numbers are wrong.

Two ways to start

Five minutes on the phone usually tells us whether it is a grind and seal, a coating or a polish.

Send the plans

Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.