Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Concrete floors made for Latimer weather

If you run a business or own a home in Latimer, the floor question starts the same way: what is under the old finish, and how wet is the slab? We find that out before we quote. It sits in Jackson County, about 84 miles northeast of Harvey.

Latimer, Jackson County, Mississippi.

Homes and businesses here

Housing figures from the US Census.

The median home in Latimer was built around 2000, by the Census count. Commercial slabs from this era usually come with a spec, a moisture limit and sometimes a vapor barrier we can check against the drawings. That makes the submittal side straightforward.

The slab still gets tested, since a spec on paper never dried any concrete.

That mix decides who calls: owners redoing a garage or patio, landlords between tenants, or a business with a shop or a kitchen.

Shipbuilding at Pascagoula, the port at Gulfport and the port of Mobile put a lot of industrial floor work on this coast, from fab shops to big warehouses. Around Jackson County, the floor work is mostly this: shipyard and refinery support buildings, plant floors that see chemicals, and older homes and shops in Ocean Springs and Moss Point.

Latimer is on the Gulf Coast in Jackson County, Mississippi, where salt air, hurricane history and twenty years of rebuilding since Katrina shape the buildings near the water.

Stand-alone houses make up the bulk of it, roughly 69%. Mostly detached housing points toward residential coatings: garage epoxy, patio overlays, pool deck finishes and the occasional polished interior slab.

Humidity and the slab

The Mississippi Gulf Coast.

Latimer is in Jackson County, about 84 miles northeast of the shop.

Building since 2005 means a lot of elevated houses, with the ground-level slab used for parking, storage or an outdoor kitchen, plus plenty of commercial space poured fresh. Casino and hotel floors carry heavy foot traffic, spilled drinks and cleaning carts at every hour, and they rarely close. Pool decks and patios take full sun and bare feet. Each wants a different build, and on this coast the schedule usually matters as much as the system.

Have the crew sound out dock edges, stair landings and patios near the water with a hammer, because salt-damaged concrete often rings hollow before it looks bad.

For a casino, hotel or restaurant, pick a system that can go down and take traffic between closing and reopening, and book that window early.

Under an elevated house, choose a flake or broadcast floor you can hose off after a storm, and keep high-gloss finishes for rooms that stay dry.

Polish or coating

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Light gray textured overlay pool deck with a drain grate, the pool and lounge chairs behind it

Pool Deck Coatings

Textured overlays and flake decks in light, cooler colors, sealed with grit and built to live with chlorine, salt and wet feet.

Light cream concrete overlay under an open steel pavilion leading to a wood-sided building

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

How any floor here gets built

The same order on every job, whatever the system.

Surface

Topcoat or guard, set to the traffic and the shine you want.

Body

The color and the thickness: epoxy, urethane cement, stain or an overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

The concrete as we find it. Moisture, old sealer and cracks decide everything above it.

The next towns over

More in Jackson County, on the services page and in the gallery.

Things to know first

Or send the plans first.

Got a slab question we did not cover? Call.

(504) 231-6298

Do you come out to Latimer?

Yes. Latimer is about 84 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 2000?

Expect a few shrinkage cracks from the first year or two. They have usually stopped moving and fill cleanly before coating or polishing.

Why does a patio coating turn yellow near the beach?

Most likely it was plain epoxy, which breaks down in direct sun. Outdoors we finish with a UV-stable urethane topcoat that holds its color. Texture goes into that topcoat too, so the patio still grips when it is wet.

Can you coat casino or hotel floors without shutting them down?

Usually, by working in sections overnight or in the slow hours and picking systems that cure in time to reopen. We plan the phases with the property before we start. If a system cannot cure inside the window, we tell you that up front.

Can an older slab that once took salt water be saved?

Most can. We grind off old finishes, sound the concrete, cut out spalls and treat any rusting steel before patching. Once the slab is sound and tests dry enough, a new system goes down over it.

Which details help you put a quote together?

The size of the area, what the floor has to handle and when you need it back. For commercial work, add the specs, the shutdown window and any submittal requirements. From there we come back with a price.

How long does a typical floor take?

A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.

Where do furniture, cars and equipment go?

Everything comes out of the work area, and cars stay out until the coating cures. For a plant or a kitchen, plan where the equipment sits during the job and when it comes back.

Does hurricane season change the schedule?

Indoor work goes on as normal. Outdoor jobs and anything with a long cure get planned around the forecast, and if a storm is coming we would rather move the date than rush a coating.

Two ways to start

Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.

Send the plans

Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.