Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Static-control floors that bleed charge to ground

ESD floors for electronics benches, labs, control rooms and server rooms, built with conductive primer, copper ground strips and a resin topcoat that moves static off people and carts before it reaches a board.

22 years in businessCoatings5.0 on Google from 36 reviews

What it is

Every person who walks across an ordinary coated floor picks up a charge. In a warehouse nobody notices. On an electronics line, in a lab or a server room, that spark can kill a board you never see fail until it is in the field. An ESD floor gives that charge a controlled path to ground through the resin itself. This is the floor for plants with electronics lines, healthcare and lab spaces, government control rooms, and any owner with racks of servers sitting on a slab.

There are two kinds. Static-dissipative floors move charge at a controlled rate and suit most assembly areas, control rooms and data rooms. Conductive floors move it faster and go where the spec calls for them, usually around sensitive components or where workers wear grounding footwear. Most rooms land on dissipative. The engineer or the owner’s spec decides which one, and we build to that number. Get that number in writing before anyone mixes a kit.

From across the room an ESD floor looks like any solid-color epoxy. The difference sits underneath and inside it: copper grounding strips tied to building ground, a conductive primer that spreads charge across the slab, and a topcoat loaded with conductive fillers. A standard epoxy floor or industrial coating is an insulator. Put one in a server room and you have a clean, shiny floor working against the room. Colors run narrower, since the fillers can show as fine dark flecks, and the topcoat goes down at the thickness the system calls for, because extra build can push the readings out of range.

Part of our coatings work. See all of it.

Start with the concrete.

What goes down, from the surface you walk on to the slab under it.

We will not put an ESD floor over a slab that fails a moisture test, because a floor that lifts stops grounding.

  1. ESD topcoat

    The colored wearing layer, with conductive fillers mixed through it, is what people walk on and what gets tested.

  2. Conductive primer

    A black, carbon-loaded primer bridges the strips and spreads charge evenly under the whole floor.

  3. Copper ground strips

    Thin copper tape laid in a grid or loops, tied into building ground.

  4. Base coat

    A primer or epoxy body coat seals the profiled slab and fills pinholes so the conductive layers sit on something sound.

  5. Slab as found

    Bare concrete, often with old coating, adhesive or oil, checked for moisture before anything else happens.

Where it belongs

  • Electronics assembly

    Benches, pick-and-place lines and rework stations where one discharge can ruin a board nobody knows is ruined.

  • Server and data rooms

    Racks sit on the slab and techs walk in charged. The floor takes that charge before a hand reaches a chassis.

  • Labs

    Research and testing rooms where instruments are sensitive and the floor also takes spills and cart traffic.

  • Control rooms

    Plant, utility and government control rooms full of consoles that run around the clock and cannot take a hit.

How the crew runs it

Five steps, in order.

  1. Read the spec

    We get the resistance range, the standard it is written to and the ground points from the engineer before we price anything.

  2. Grind and test moisture

    We grind to a clean profile and test the slab for moisture vapor before any resin goes down.

  3. Lay the copper

    Copper strips go down on the base coat in the planned layout, with leads left at the points where they tie into building ground.

  4. Primer and topcoat

    The conductive primer rolls out over the strips, then the ESD topcoat goes on at the specified thickness, kept even with no heavy spots.

  5. Test before handover

    Once it cures, the floor gets resistance readings across the room, and any spot out of range gets fixed before anyone signs off.

For the GC or the facility

  • Send the ESD spec section and the resistance range with the drawings so the quote matches the submittal.
  • Product data, sample chips and the test method are available for submittals on request.
  • Plan the floor before the racks, benches and equipment move in. Testing needs open floor and a full cure.
  • In most buildings the electrician makes the final tie to building ground, so book them for the day the strips go down.

Gulf South conditions

Down here the air is wet most of the year, and that cuts both ways on an ESD floor. Humidity bleeds off some static by itself, so a room can feel fine all summer, then a dry cold snap or a hard-running air handler drops the humidity and the zaps start. The floor has to do the work on its own in the driest week of the year, and that is the standard we build it to.

The bigger threat is under the slab. A lot of ground-floor rooms around here sit on slabs with vapor pushing up from a high water table, and an ESD system will blister and lose bond like any resin if that moisture is not dealt with first. Electronics rooms also run cold and dry while the outside stays hot and damp, so we watch for slabs that sweat at the edges and door openings.

Look at the finish.

“What set them apart was that they offered the product I actually wanted, not what was quickest or easiest for them.”

Jason Lagneaux, Google review5.0 on Google from 36 reviews

Living with it

Dust mop and damp mop with a neutral, no-residue cleaner. Skip waxes, floor finishes and polishes of any kind, since they lay an insulating film over the floor and throw the readings off. Keep rubber mats and carpet runners off it unless they are rated ESD. Recheck resistance on a schedule the owner’s quality program sets.

Questions about esd flooring

See finished jobs in the gallery, or book a slab visit.

What is the difference between static-dissipative and conductive?

Both move charge to ground through the floor. Conductive floors do it faster and sit at the low end of the resistance scale, while dissipative floors move it at a slower, controlled rate. Your spec or the equipment maker should name the range, and we build to it.

Can you put an ESD floor over our existing epoxy?

Sometimes, if the old coating is well bonded and the spec allows it. More often the old floor comes off, because we cannot vouch for what is under it or how it was put down.

Do you need the room empty?

For the install and the testing, yes. The copper layout and the readings both need open floor, and racks or benches set on curing resin will mark it. If the room cannot empty all at once, we can work it in sections, though the copper has to tie together across the seams.

How is the floor tested?

After the coating cures, resistance readings are taken at points spread through the room, using the method the spec names. Readings out of range get tracked down and fixed before turnover.

Does an ESD floor replace grounding straps and footwear?

No. The floor is one part of a static-control program, and it works with ESD footwear, heel straps and wrist straps at the bench. Street shoes insulate people from it, so the footwear matters as much as the floor.

Will it hold up to carts and foot traffic?

Yes. The topcoat is a resin wearing surface, and it takes cart wheels and steady foot traffic like any coated floor. Pallet jacks with steel wheels and dragged equipment are what scar it, and a scar can change the reading in that spot.

Let’s look at your floor.

Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.

A phone number or an email is enough. The office answers within a working day.