What we put down on Berwick concrete
With Berwick sitting 71 miles west of Harvey, a site visit is a normal day for us. Dustin looks at the slab and asks about traffic and timing, then Jacob’s crew takes it from there.
Berwick, St. Mary Parish, Louisiana.
How Berwick is built
Housing figures from the US Census.
Census numbers put the typical home in Berwick at about 1979. A fifty-year-old garage slab has usually earned its cracks. If the control joints were cut shallow or late, the slab cracked where it wanted to.
We fill those cracks to suit the coating plan and treat real joints as joints.
We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.
Floors around Berwick live with basin water close by, long humid summers and Gulf storms that come up through the marsh, so moisture is a question on every slab. Around St. Mary Parish, the floor work is mostly this: fabrication shops, marine yards and oilfield service buildings in salt air and storm country, plus homes along the bayous.
Up the Teche, the old sugar towns keep brick main streets, churches and houses that go back generations, with newer slabs poured out on the edges of town.
Roughly 64% of homes are stand-alone houses; the rest is everything else. A mix of houses and apartments means two kinds of floor work: garages and patios for owners, and breezeways and laundry rooms for whoever runs the multifamily buildings.
Vapor before primer
The Atchafalaya and Bayou Teche country.
Berwick is in St. Mary Parish, about 71 miles west of the shop.
The Atchafalaya Basin is the largest river swamp in the country, and the land around it sits low with water close under the surface. On-grade slabs keep drawing moisture up from below, and the humid air adds more from above. A coating laid without a moisture test is a bet against that water. We read the slab first, and when the numbers run high, a moisture-tolerant primer or a urethane cement goes down before the finish system.
For a yard or fab shop, size the floor to the heaviest thing that gets dropped or dragged across it, because thin coatings fail fast under steel and slag.
Mill and cane farm shop floors should get a coarse broadcast texture, because field mud and wet boots turn a smooth coating into a hazard within a day.
If a building has taken storm water, budget time to grind off what was laid over the old slab, since residue left underneath shortens the life of anything new.
Kitchens and plant floors
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Bayou Vista
2 miles away, St. Mary Parish
- Morgan City
2.7 miles away, St. Mary Parish
- Patterson
4.5 miles away, St. Mary Parish
- Siracusaville
5.1 miles away, St. Mary Parish
More in St. Mary Parish, on the services page and in the gallery.
Do you come out to Berwick?
Yes. Berwick is about 71 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1979?
Some 1970s slabs have a thin plastic vapor barrier and some have none, so a moisture test tells us which one you have. Sheet vinyl and its adhesive are common on top and grind off slowly.
How thick should a floor be in a boat yard or pipe shop?
Thick enough for what lands on it. Troweled epoxy and urethane cement go down far heavier than a roll coat, and a heavy broadcast build adds grip and wear. We set the build over a shot-blasted slab once we know the loads.
Can an old storefront in a Teche town get a polished floor?
We find out after the grind. If the concrete under the tile and glue is sound, a honed or polished finish shows its age, patches included. Where it is broken up or badly out of level, we repair it or put down a micro-topping instead.
What floor does a crawfish or seafood processing room need?
Urethane cement, run up the walls as cove base and finished with a texture that grips under water. Those rooms get hot water and harsh cleaners every shift, and urethane cement handles both. We check the drains and the slope before the build so water actually leaves the room.
Why do coatings lift on slabs near the Atchafalaya Basin?
Moisture coming up from below is the usual reason, and poor surface prep is the other. Vapor pushes on a coating until the bond lets go. We grind the slab, test it and match the primer to the readings.
Do I have to be there for the visit?
It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.
How long does a typical floor take?
A two-car garage usually takes one to two days of work plus cure time. Bigger commercial floors depend on square footage, the system and how much prep the slab needs, and the schedule comes with the quote.
Is there anything to do for a commercial floor before you start?
Send the submittal requirements and any site safety rules early. Have equipment moved, drains and doorways marked and the area closed to other trades while we work.
My slab sweats in the summer. Is that a problem?
It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.
Pick your way in
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.