Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Urethane cement where Bay St. Louis kitchens run hot

Commercial floors around Bay St. Louis take hot water, grease and wheeled traffic all day. Jacob Lawson’s crew has spent 22 years grinding slabs like these, and every job still starts at bare concrete. It sits in Hancock County, about 52 miles northeast of Harvey.

Bay St. Louis, Hancock County, Mississippi.

Bay St. Louis by the numbers

Housing figures from the US Census.

The median home in Bay St. Louis was built around 1994, by the Census count. Tile set on thinset covers a lot of 1990s kitchens and baths. Removing it is loud, dusty work, and we run dust collection on the grinders the whole time.

What is left once the mortar is gone is usually a good, flat slab.

Most homes here are stand-alone houses, about 79 in every 100. A place made up mostly of houses has a lot of garage floors, and garage floors are where cheap coatings fail first. We grind them and build a flake or solid epoxy that can take hot tires.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

A great deal of what stands around Bay St. Louis went up after Katrina, so newer slabs sit next to older buildings that took water and were repaired rather than replaced. Around Hancock County, the floor work is mostly this: garage slabs under raised homes, commercial builds along I-10 and the older storefronts of Old Town Bay St. Louis.

Bay St. Louis is on the Gulf Coast in Hancock County, Mississippi, where salt air, hurricane history and twenty years of rebuilding since Katrina shape the buildings near the water.

When the slab stays damp

The Mississippi Gulf Coast.

Bay St. Louis is in Hancock County, about 52 miles northeast of the shop.

Katrina came ashore near the Louisiana and Mississippi line in 2005 and pushed surge across the whole coast, from Waveland and Bay St. Louis through Biloxi to Pascagoula and on into Mobile. Much of the coast was rebuilt afterward, with houses raised and businesses redone or moved. That leaves post-storm slabs beside older floors that once sat under salt water. Those older floors get ground to clean concrete, tested and repaired before anything goes over them.

For a casino, hotel or restaurant, pick a system that can go down and take traffic between closing and reopening, and book that window early.

Outdoor slabs need a UV-stable topcoat and a lighter color, since coastal sun yellows plain epoxy and a dark deck gets too hot for bare feet.

Have the crew sound out dock edges, stair landings and patios near the water with a hammer, because salt-damaged concrete often rings hollow before it looks bad.

Matching the system to the space

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Light gray textured overlay pool deck with a drain grate, the pool and lounge chairs behind it

Pool Deck Coatings

Textured overlays and flake decks in light, cooler colors, sealed with grit and built to live with chlorine, salt and wet feet.

Terracotta stamped brick-pattern overlay across a fenced patio with potted plants

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

How any floor here gets built

The same order on every job, whatever the system.

Surface

The finish you actually walk on, matched to the use.

Body

Where the system gets its build: resin, cement or a decorative overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.

The next towns over

More in Hancock County, on the services page and in the gallery.

Your slab, your questions

Or send the plans first.

Rather ask a person? The office picks up.

(504) 231-6298

Do you come out to Bay St. Louis?

Yes. Bay St. Louis is about 52 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1994?

If the floor took water in a later storm, look for drywall mud and mold-treatment residue near the walls. It all grinds off, and we check moisture before we coat.

Why does a patio coating turn yellow near the beach?

Most likely it was plain epoxy, which breaks down in direct sun. Outdoors we finish with a UV-stable urethane topcoat that holds its color. Texture goes into that topcoat too, so the patio still grips when it is wet.

Can you coat the ground-level slab under an elevated house in Bay St. Louis?

Yes, and that slab does a lot of work as parking, storage or a shop. A flake or broadcast system bonds well to it and hoses clean after a storm. We test moisture first, because ground-level concrete near the coast often stays damp.

Can an older slab that once took salt water be saved?

Most can. We grind off old finishes, sound the concrete, cut out spalls and treat any rusting steel before patching. Once the slab is sound and tests dry enough, a new system goes down over it.

What happens during a site visit?

Dustin walks the slab, looks at the cracks, joints and anything glued or coated to it, and asks what the floor has to handle. Sometimes he runs a quick moisture check in a corner. The quote you get is built on what he saw.

Is there a wait before cars or forklifts go back on?

Yes. Vehicles wait for a fuller cure, often several days on a coated garage and longer for heavy equipment. Polished concrete can usually take traffic as soon as the crew packs up.

Is there anything to do for a commercial floor before you start?

Send the submittal requirements and any site safety rules early. Have equipment moved, drains and doorways marked and the area closed to other trades while we work.

My slab sweats in the summer. Is that a problem?

It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.

Start with the slab

Five minutes on the phone usually tells us whether it is a grind and seal, a coating or a polish.

Send the plans

Facility managers and GCs: send what you have, even a floor plan sketch, and the dates the space can be shut down.