Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Where Pierre Part floors start: the slab

Big community or small, Pierre Part deals with the same concrete trouble as the rest of the Gulf South: vapor coming up from below and old adhesive sitting on top. Our crew has spent 22 years grinding through it. It sits in Assumption Parish, about 68 miles west of Harvey.

Pierre Part, Assumption Parish, Louisiana.

The drive from Harvey

Housing figures from the US Census.

Census numbers put the typical home in Pierre Part at about 1979. Additions and enclosed carports are common on houses this age, so one room can sit on a slab poured decades after the rest. The two pours rarely match in height or moisture.

We grind, patch the seam and treat them as two slabs until the coating ties them together.

The work here runs on oilfield service, shipyards, boat builders and seafood, plus the shops, warehouses and offices behind them, from Houma and Thibodaux down toward the coast.

Most homes here are stand-alone houses, about 70 in every 100. Neighborhoods of houses carry plenty of slabs that have never been coated, and a bare slab is the easiest kind to start with.

We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.

Assumption Parish is bayou country, and Pierre Part shares what that means for a building: water close at hand, ground that stays damp, and storms that can roll straight in off the Gulf. Around Assumption Parish, the floor work is mostly this: mill shops, farm sheds, churches and small-town storefronts, mostly older slabs that need real prep before any coating goes down. Close by, typical homes run from about 1968 in Supreme to 1982 in Belle Rose, and Pierre Part sits on the newer side of that spread.

What the weather does to a slab

Bayou Lafourche and Terrebonne.

Pierre Part is in Assumption Parish, about 68 miles west of the shop.

Ground water sits close to the surface across the bayou parishes, and on-grade slabs pull that moisture up through the concrete. It shows as dark patches, white efflorescence, or coatings that blister and lift. Every slab gets a moisture test before we choose a system. High readings call for a moisture-mitigating epoxy primer or urethane cement, which can go down over damp concrete that would ruin a standard coating within a season.

For a home in Pierre Part that has taken water before, choose a flake system you can scrub and pressure wash after a storm without it lifting.

Run cove base and sealed joints in kitchens and seafood rooms, because water left standing where the floor meets the wall is where bacteria and failures start.

In a shop or yard near Pierre Part, pick a troweled or heavy broadcast system, because welding spatter and dropped parts chew through thin coatings fast.

Systems that hold up here

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

A rug pattern in red, blue and turquoise stained into a gray textured concrete porch floor

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Cream stained concrete divided by rust bands with turquoise squares and a teal fleur-de-lis in a rust ring

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

The finish you actually walk on, matched to the use.

Body

Where the system gets its build: resin, cement or a decorative overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.

The next towns over

More in Assumption Parish, on the services page and in the gallery.

Straight answers on floors

Or send the plans first.

Got a slab question we did not cover? Call.

(504) 231-6298

Do you come out to Pierre Part?

Yes. Pierre Part is about 68 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1979?

Check whether it is post-tensioned before anyone drills or cuts. Grinding and coating are surface work and safe either way.

Do you put down floors in seafood processing rooms and commercial kitchens?

Yes. Those rooms need urethane cement, cove base up the walls and a textured surface that keeps its grip when wet. Urethane cement handles hot water washdown and cleaning chemicals that would soften many epoxies.

What floor works in a shipyard or fabrication shop?

A thick system over a shot-blasted slab, such as troweled epoxy, urethane cement or a heavy broadcast build. These take impact, heat and oil that would wreck a thin coating. We size the thickness to what gets dropped and dragged across the floor.

Can you redo a floor after storm flooding?

Yes, once the slab has dried and been tested. We grind off the old finish and contamination, repair cracks and spalls, then install the new system. If the building is waiting on other repairs, we fit the floor into that schedule.

Why do garage floor coatings peel in bayou country?

Moisture coming up through the slab is the usual cause, along with poor prep. Water vapor pushes on a coating from below until it lets go. We grind the slab and test moisture first, then use a primer rated for the readings.

Can you quote from photos or plans instead of a visit?

For commercial jobs, drawings, square footage and a schedule are often enough to price the work, with a look at the slab before we start. For homes, photos help, but we want to see the concrete in person before we commit to a system.

When can I walk on it?

Light foot traffic is typically fine within a day on most coatings, and full cure takes longer. We give you the timing for your system, because urethane cement, epoxy and polished concrete all behave differently.

What do I need to do before the crew shows up?

Clear the floor completely, including shelves, stored items and anything you want moved. Make sure the crew has access to power and water. After that, stay off the slab once prep starts.

My slab sweats in the summer. Is that a problem?

It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.

Call it in or send the plans

Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.

Send the plans

Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.