Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

Healthcare floors that clean all the way to the wall

A clinic floor gets cleaned hard every day and has to go in without putting dust near patients. We build resin floors with integral cove and honed concrete, planned around infection control and phased schedules.

22 years in businessCommercial5.0 on Google from 36 reviews

What it is

Look at the corner where a vinyl floor meets the wall in an exam room and you will usually find a dark line. That line is the problem: seams, rubber base and grout joints hold whatever the mop pushes into them. A healthcare floor should give dirt nowhere to sit and hold up to disinfectant several times a day. It also has to go in without filling a working building with dust.

We use two systems for it. The first is a resin floor, epoxy or urethane cement, laid as one continuous surface and run up the wall as an integral cove, so floor and base are one material with no joint between them. It suits exam rooms, soiled utility, kitchens and corridors that see carts and spills. The second is honed concrete, a ground slab with a low sheen and a penetrating guard, for lobbies and waiting areas where the traffic is mostly feet and wheelchairs. Resin is the call wherever water, fluids or chemicals reach the floor, and honed concrete fits where they rarely do.

Honed concrete belongs on that list too. In a clinic or hospital the installation is half the job: dust containment your infection-control team signs off on, work phased room by room so departments keep running, low-odor materials near patients, and a schedule that bends when a wing cannot close. Plenty of crews can lay resin. Fewer will build the plastic walls, run negative air and clean the corridor before the first shift. We price healthcare work with the containment built in, never as an extra someone finds later.

Part of our commercial work. See all of it.

Start with the concrete.

What goes down, from the surface you walk on to the slab under it.

We will not hang one sheet of plastic across a hallway and call it containment, because in a building full of patients the dust goes somewhere.

  1. Sealed topcoat

    A chemical-resistant urethane topcoat, textured for wet areas, is what staff walk and mop on.

  2. Body coat and cove

    The resin body coat goes down and turns up the wall over a cove strip as one piece with the floor.

  3. Primer and repairs

    Cracks get filled and a wet slab gets a vapor-mitigating primer before any body coat.

  4. Remove and profile

    We remove the old floor inside containment and grind or shot blast to a profile the resin can bond to.

  5. Existing floor

    Usually VCT or sheet vinyl over adhesive, on a slab we test for moisture before choosing anything.

Where it belongs

  • Exam and procedure rooms

    Resin with integral cove, so the corner where floor meets wall wipes down with the rest of the room.

  • Corridors and lobbies

    Honed concrete takes carts, beds and wheelchairs at a low sheen with little glare under hallway lights.

  • Kitchens and soiled utility

    Urethane cement stands up to hot water and harsh chemicals, and the cove keeps water out of the wall cavity.

  • Labs and pharmacy

    A chemical-resistant resin floor that takes spills and gets cleaned as often as the counters do.

How the crew runs it

Five steps, in order.

  1. Read the risk plan

    We walk the area with your facilities and infection-control staff and work to the containment level they set.

  2. Phase the building

    Rooms and corridors go into a sequence that keeps departments open, and patient routes are changed before work starts.

  3. Build containment

    Hard or plastic barriers, sticky mats and negative air go up, and grinders run on HEPA dust collectors.

  4. Prep and coat

    We pull the old floor, profile and prime the slab, lay the body coat and cove, then the topcoat.

  5. Clean and release

    Containment comes down after the room is cleaned and checked, and each phase is handed back before the next one opens.

For the GC or the facility

  • We work to the containment and phasing plan your infection-control team sets, nights and weekends where needed.
  • Resin floors typically take foot traffic the next day and full use after a few days, and the submittals give cure times per product.
  • Product data, cove details and samples on request.
  • The slab gets a moisture test once the old floor is up, and walls should be sound where the cove turns up.

Gulf South conditions

Hospitals and clinics in the Gulf South run their air conditioning hard, which helps a resin cure. The danger is under the floor. Older buildings in New Orleans and the river towns often sit on slabs with vapor coming up from a high water table, and old vinyl can hide it for years. Once that floor comes up we test, and a high reading means a vapor-mitigating primer before any body coat.

Hurricane season adds the other risk. A facility coming back from flood water needs floors on a tight clock, and a slab that took on water has to dry or be primed for it before resin goes down. Humidity also slows cure wherever the air handlers are off, so on a phased job we work out with facilities how to keep the work area conditioned without breaking containment.

Look at the finish.

“Extraordinary Flooring completed 2 projects for me while I was managing projects for Hilton Worldwide. They were professional, coordinated their work with all operational activities, analytical and proactive when responding to difficult situations.”

Keith Faust, Google review5.0 on Google from 36 reviews

Living with it

Clean with the disinfectants your facility already uses, checked against the topcoat’s chemical resistance data. Auto-scrubbers and wet mops are fine. Do not drag equipment with bare metal feet, and recoat a worn corridor before traffic wears through to the body coat.

Questions about healthcare flooring

See finished jobs in the gallery, or drop the office a line.

What is integral cove, and why does it matter?

Integral cove means the resin turns up the wall in one piece over a curved strip, with no separate rubber base. There is no joint at the corner for dirt and water to collect in, and the mop cleans the base with the floor. We recommend it anywhere a room gets wet-cleaned.

How do you keep dust away from patients?

Containment goes up before any grinding, with barriers, sticky mats and negative air so the work area pulls air in and dust stays inside. Grinders and vacuums run on HEPA collection. The barriers stay up until the room is cleaned and your team releases it.

Can you work while the facility stays open?

That is how most healthcare floors have to go in. We phase room by room or wing by wing and work nights and weekends where it helps. The phasing plan is agreed with your facilities team before we start.

Resin or honed concrete for our corridors?

Honed concrete suits corridors and lobbies with mostly foot and wheeled traffic, and the low sheen keeps glare down. Where fluids or heavy wet cleaning reach the floor, resin with a cove is the better call.

Will the resin stand up to our disinfectants?

Healthcare resin topcoats are built for daily disinfection, but chemistries differ. We check your cleaning products against the topcoat’s resistance data before we specify it. If something in your rotation is unusually harsh, we choose a topcoat rated for it or test a sample first.

What do you need from us to price it?

Send the drawings and your infection-control requirements, or have Dustin walk the space with your facilities manager. We need to know which rooms get resin and cove, which get honed concrete and when each area can close. The quote is built around that schedule, containment included.

Let’s look at your floor.

Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.

A phone number or an email is enough. The office answers within a working day.