Old glue up, new floor down in Hide-A-Way Lake
Big community or small, Hide-A-Way Lake deals with the same concrete trouble as the rest of the Gulf South: vapor coming up from below and old adhesive sitting on top. Our crew has spent 22 years grinding through it. It sits in Pearl River County, about 54 miles northeast of Harvey.
Hide-A-Way Lake, Pearl River County, Mississippi.
How Hide-A-Way Lake is built
Housing figures from the US Census.
The median home in Hide-A-Way Lake was built around 1987, by the Census count. Carpet glue is the big one on 1980s floors. Most of it scrapes and grinds off clean, leaving a slab that is ready for a coating or polish after crack repair.
The tack strip holes along the walls get filled either way.
Stand-alone houses make up the bulk of it, roughly 98%. In a community of mostly houses, the interior slab under old carpet or tile is worth a look. Ground and polished, it makes a hard floor that stays cool underfoot through Gulf summers.
We read those numbers the way we read a slab: they say whether to expect garages, rentals or commercial floors before we drive out.
Floors in Hide-A-Way Lake deal with long humid summers, heavy rain and the occasional Gulf storm that arrives still carrying plenty of wind and water. Around Pearl River County, the floor work is mostly this: newer homes and garages, metal shops on bare slabs, and school and town buildings in Picayune and Poplarville.
Hide-A-Way Lake is in Pearl River County, Mississippi, in the Pine Belt, where pine timber, red clay roads and loaded log trucks have been part of the scenery for generations.
Sweating floors
The Pine Belt.
Hide-A-Way Lake is in Pearl River County, about 54 miles northeast of the shop.
Summers here run long, hot and damp, and afternoon storms dump heavy rain in a hurry. Slabs on grade pick up moisture from the ground, and a building closed up through a humid spell can have a floor that sweats. That is how a garage coating or a gym floor starts to blister. We test the slab before we pick anything, and when the readings are high the build starts with a moisture-tolerant primer or urethane cement.
Plan a hospital or clinic floor with the infection control team early, because the work zone, dust control and cure times all have to suit a building that never closes.
Before filling a crack in an older slab, have it checked for movement, since a rigid filler in a crack that still moves will open right back up.
For a mill or timber equipment shop, go thick with a troweled or broadcast system, because skidder parts, chain and mud wear out roll-on coatings in a season.
Commercial and home floors
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Picayune
3.8 miles away, Pearl River County
- Nicholson
7.2 miles away, Pearl River County
- Pearl River
16 miles away, St. Tammany Parish
- Kiln
17 miles away, Hancock County
More in Pearl River County, on the services page and in the gallery.
Do you come out to Hide-A-Way Lake?
Yes. Hide-A-Way Lake is about 54 miles northeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1987?
A slab this age is usually past its settling and in good shape structurally. Expect a day or so of extra prep if it had tile, and less if it had carpet.
Why do cracks keep coming back in Pine Belt slabs?
Often the crack is still moving, from the ground underneath or from the slab itself. A rigid filler cannot follow that movement, so it breaks loose. We check the crack, then choose a semi-rigid or flexible repair and carry it through the coating system.
Does the humidity in Hide-A-Way Lake change how a garage floor goes down?
It can. High humidity over a cool slab means condensation, and some coatings cloud or lose adhesion when that happens. We check the dew point and the slab temperature on the day and time the coats around them.
What floor works in a sawmill shop or timber equipment barn?
A thick troweled epoxy, urethane cement or heavy broadcast system over a ground or shot-blasted slab. Mud, chain, hydraulic oil and steel tracks wear through thin coatings fast. Coarse texture keeps it walkable when it is wet.
Can you quote from photos or plans instead of a visit?
For commercial jobs, drawings, square footage and a schedule are often enough to price the work, with a look at the slab before we start. For homes, photos help, but we want to see the concrete in person before we commit to a system.
Will the whole floor be out of service at once?
Not always. Larger floors can be done in sections so part of the building stays open, with the order planned around traffic. It takes longer overall, and nobody has to shut down completely.
Is there anything to do for a commercial floor before you start?
Send the submittal requirements and any site safety rules early. Have equipment moved, drains and doorways marked and the area closed to other trades while we work.
After a flood, how soon can a floor be coated?
Not until the slab has dried out and been tested. Flood water leaves salts and silt in the concrete, so we grind deeper and check moisture before committing to a coating. Rushing it is how a new floor fails a year later.
Pick your way in
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
Send the plans
Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.