Based in Harvey, Louisiana. We work about 100 miles out.
(504) 231-6298 Send the plans
Home
Services
Areas
Service Areas
Louisiana
Orleans Parish
St. Tammany Parish
St. Charles Parish
St. John the Baptist Parish
Jefferson Parish
St. Bernard Parish
Lafourche Parish
Tangipahoa Parish
St. James Parish
Livingston Parish
Washington Parish
Plaquemines Parish
Ascension Parish
Assumption Parish
St. Helena Parish
Terrebonne Parish
East Baton Rouge Parish
St. Martin Parish
East Feliciana Parish
Iberville Parish
West Baton Rouge Parish
St. Mary Parish
Pointe Coupee Parish
West Feliciana Parish
Mississippi
Alabama
Mobile County
Gallery Visualizer About Blog Contact Call the office, (504) 231-6298
Skip to content

A Westbank flooring crew working Choctaw

Call it 40 miles west of Harvey from our door to Choctaw. The crew makes that drive with everything a commercial or residential floor needs, and the slab gets ground before anything goes on it.

Choctaw, Lafourche Parish, Louisiana.

Choctaw by the numbers

Housing figures from the US Census.

Half the homes in Choctaw are older than about 1986 and half are newer, according to the Census. Slabs from the 1980s are usually in better shape than older ones, with a vapor barrier more often in place and finishing done with power trowels. That smooth, dense surface is good news for polish.

It is harder news for coatings, which need the grinder to open it up first.

Numbers like these are why we ask what the space is used for before we talk systems.

Shop floors across the bayou parishes take a beating from steel, hydraulic oil and heavy parts, while homes and businesses want a floor that comes through the next high water. Around Lafourche Parish, the floor work is mostly this: shipyard and fabrication floors down the bayou, oilfield shops near Fourchon, and homes and schools from Thibodaux to Cut Off. Close by, typical homes run from about 1977 in Bayou Country Club to 1990 in Kraemer, and Choctaw sits on the newer side of that spread.

Lafourche Parish is bayou country, and Choctaw shares what that means for a building: water close at hand, ground that stays damp, and storms that can roll straight in off the Gulf.

Stand-alone houses make up the bulk of it, roughly 76%. When nearly every home is a house, the driveway counts as a floor too. Concrete that has cracked or stained out front can be repaired and coated with something built for sun and rain.

Rain and curing times

Bayou Lafourche and Terrebonne.

Choctaw is in Lafourche Parish, about 40 miles west of the shop.

Shipyards, fabrication shops and oilfield service buildings put floors through welding slag, dropped steel, forklift wheels and spilled oil. Thin roll-on coatings do not last in that service. Troweled epoxy, urethane cement and heavy broadcast systems over a shot-blasted profile hold up far longer. Older homes and businesses along the bayous bring their own trouble: patched slabs, additions poured at different times, and floors that have already been under water once.

Test slab moisture before any coating goes down, since the high water table under bayou country will find any primer that was not built for it.

In a shop or yard near Choctaw, pick a troweled or heavy broadcast system, because welding spatter and dropped parts chew through thin coatings fast.

For a home in Choctaw that has taken water before, choose a flake system you can scrub and pressure wash after a storm without it lifting.

Where each floor makes sense

Garage Floor Coatings

Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Terracotta stamped brick-pattern overlay across a fenced patio with potted plants

Patio Coatings

Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Glossy blue-green stained concrete reflecting a row of colored window panels in a commercial room

Concrete Staining

Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.

How any floor here gets built

The same order on every job, whatever the system.

Surface

The finish you actually walk on, matched to the use.

Body

Where the system gets its build: resin, cement or a decorative overlay.

Primer

Soaks in and locks the system to the concrete.

Profile

Ground or shot blasted until the surface opens up and a coating can bite.

Slab

Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.

The next towns over

More in Lafourche Parish, on the services page and in the gallery.

Questions about floors in Choctaw

Or send the plans first.

Want a straight answer today? Ring the office.

(504) 231-6298

Do you come out to Choctaw?

Yes. Choctaw is about 40 miles west of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.

What should I know about a slab from around 1986?

Find out if it is post-tensioned. We grind only the surface and locate the cables before any cut or anchor.

What floor works in a shipyard or fabrication shop?

A thick system over a shot-blasted slab, such as troweled epoxy, urethane cement or a heavy broadcast build. These take impact, heat and oil that would wreck a thin coating. We size the thickness to what gets dropped and dragged across the floor.

How long before people and trucks can use a new floor?

It depends on the system and the temperature. Foot traffic often comes the next day, while vehicles and heavy loads usually wait several days for a full cure. We give you the actual times for the product we install.

Do you put down floors in seafood processing rooms and commercial kitchens?

Yes. Those rooms need urethane cement, cove base up the walls and a textured surface that keeps its grip when wet. Urethane cement handles hot water washdown and cleaning chemicals that would soften many epoxies.

Can you redo a floor after storm flooding?

Yes, once the slab has dried and been tested. We grind off the old finish and contamination, repair cracks and spalls, then install the new system. If the building is waiting on other repairs, we fit the floor into that schedule.

Do I have to be there for the visit?

It helps. You know where the leaks, old spills and soft spots are, and Dustin can answer questions on the spot. If you cannot make it, a manager or contractor who knows the space works fine.

What can push a schedule back?

Moisture in the slab, surprises under old flooring and rain on outdoor jobs. We test early and look under the old floor during the visit, so most of that shows up before the dates are set.

What do I need to do before the crew shows up?

Clear the floor completely, including shelves, stored items and anything you want moved. Make sure the crew has access to power and water. After that, stay off the slab once prep starts.

Can you coat floors in Choctaw in the middle of summer?

Yes, with some adjustments. Heat shortens working time, so the crew mixes smaller batches and may start early in the day. Humidity matters most for the slab underneath, which we test either way.

Start with the slab

Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.

Send the plans

General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.