Epoxy showers with no grout lines to fail
We build shower walls and floors out of resin: one continuous surface from the drain up the wall, coved at the base, sloped right, and bonded to a substrate that was built for it.
22 years in businessCoatings5.0 on Google from 36 reviews
What it is
An epoxy shower is a wet room with no grout. The floor and walls get built up in resin, the corners and the floor-to-wall joint get a cove instead of a caulk line, and the whole thing goes on as one surface that water cannot get behind. Grout is where showers fail. It cracks, it holds water, and once water gets behind tile it rots the wall long before anyone sees a stain.
We build these for houses and for rooms that get hosed down every day: gym locker rooms, dorms, healthcare bathing rooms, hotel and hospitality wet areas. In a commercial room the point is cleaning. A coved resin floor and wall lets a crew scrub and rinse without chasing mildew down grout joints, and the color stays put. At home, people want a shower that looks clean when it is clean, and a wall with nothing to regrout.
The resin is the last thing that goes in, and it is only as good as what is behind it. The walls need a rigid cement backer board, fastened and taped, or a cured mortar scratch coat. The floor needs a mortar bed already sloped to the drain, cured and dry, with the drain set at the right height and clamped. Drywall, greenboard, painted walls and wood are out. Old tile can stay only if every piece is tight and the grout is sound, and we grind it and check it before we commit. On a new build we would rather talk to the framer or tile setter before the walls close up than find out after.
Part of our coatings work. See all of it.
Start with the concrete.
What goes down, from the surface you walk on to the slab under it.
We will not coat a shower built on drywall or greenboard, however good the paint looks, because it fails from behind and takes the resin with it.
Gripped topcoat
A UV-stable urethane over everything, with fine grit in it on the floor so wet feet hold.
Body coat
The resin build that carries the look, a solid color, flake or a marble-style pour, at full thickness.
Primer and cove
Epoxy primer soaks into the backer, then a resin cove goes in at every corner and along the base.
Backer and mortar bed
Cement board on the walls and a mortar bed pitched to the drain, both cured and dry.
Framing, slab and drain
Studs, subfloor or slab, and the drain body, all solid and set before anything goes on them.
Where it belongs
Gym locker rooms
Showers that run all day and get scrubbed every night. Coved resin takes the cleaners and gives mildew nowhere to sit.
Dorms and student housing
Banks of stalls that have to come back into service between terms and stay easy for a small maintenance crew to keep clean.
Healthcare and hospitality
Patient bathing rooms and hotel wet areas, where a grout line is a cleaning problem and a stain is a guest complaint.
Home showers
Walk-in showers and tub surrounds for homeowners who are done scrubbing grout, in a solid color or a marble look.
How the crew runs it
Five steps, in order.
Look at the room
We check the framing, backer, drain and slope before we give a price, because the substrate decides whether this lasts.
Fix what is behind
Loose tile comes out, soft backer gets replaced, and the floor gets proper pitch to the drain if it lacks it.
Prime and cove
Everything is sanded, cleaned and primed, then coved at the corners and base so water has no square joint to find.
Build the resin
Body coats go on walls and floor in passes, with cure time between, until the surface is at full thickness.
Topcoat, then wait
Grit topcoat on the floor, clear on the walls, and the shower stays dry until the resin has cured hard.
For the GC or the facility
- Tell us the backer and drain before rough-in and we will tell you what we need from the framer or tile sub.
- Typical single stall: several working days, most of it cure time between coats.
- Product data and color samples for submittals on request.
Gulf South conditions
Houses here are humid inside even with the air running, and a shower wall sits in steam twice a day. Behind grout that moisture never dries out, which is why plenty of older New Orleans bathrooms smell like the wall before anyone sees the damage. Exhaust fans help. They do not fix grout. Resin that water cannot get behind takes that problem away.
The same humidity matters while we work. Resin does not like a damp backer or air sitting near the dew point, so we test the backer and mortar bed for moisture and run the air or a dehumidifier through the cure. After a flood, framing and backer have to dry out all the way before we close anything in. Coating over wet wood only hides the rot. If it means waiting another week, we wait.
Look at the finish.
“What set them apart was that they offered the product I actually wanted, not what was quickest or easiest for them.”
Jason Lagneaux, Google review5.0 on Google from 36 reviews
Living with it
Rinse it down and wipe it with a mild, non-abrasive cleaner. Skip scouring powder, steel pads and bleach left sitting on the surface, which dull the topcoat over time. Squeegee the walls if the water is hard. If something heavy chips the floor, call us early; a small repair is easy, and a chip left alone lets water work under the edge.
Next to this one
See finished floorsQuestions about epoxy showers
See finished jobs in the gallery, or reach the office.
Can you put epoxy over my existing tile shower?
Sometimes. If every tile is tight and the grout is sound, we grind the face, fill the grout lines and build resin over it. If tiles sound hollow or the wall behind is soft, they come out first, because resin only lasts as long as what it is stuck to.
Is an epoxy shower floor slippery?
Not the way we build it. The floor topcoat gets a fine grit, and how much is your call: more grip for a gym or a healthcare room, a little less for bare feet at home. The walls stay smooth so they wipe clean.
What does the cove at the base actually do?
It replaces the caulk line where floor meets wall. We build a rounded resin transition at the base and up the inside corners, so there is no square joint to crack, hold water or collect grime. It is the detail that makes the room easy to clean.
How long is the shower out of service?
Plan on the build days plus a cure period before any water touches it, and the cure depends on the resin and the room temperature. We give you the date before we start. We will not hand it over early, because water on soft resin ruins the finish.
Will it yellow or crack?
Plain epoxy can amber over time, which is why the last coat is a UV-stable urethane. Cracking almost always starts in the substrate, from framing that flexes or backer that was never fastened right, so we check both before anything goes on.
Can you do a whole locker room without shutting it down?
Usually. We can take a few stalls out at a time so the room stays open, or run the whole bank during a shutdown window if you have one. Send the plans and the schedule and we will lay out the order.
Let’s look at your floor.
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.