Polished concrete fits a community like Oak Hills Place
Oak Hills Place sits 70 miles northwest of Harvey, well inside the range our crew works. We grind the slab, deal with the moisture coming up from below and put down a floor built for Gulf weather.
Oak Hills Place, East Baton Rouge Parish, Louisiana.
The drive from Harvey
Housing figures from the US Census.
The median home in Oak Hills Place was built around 1996, by the Census count. Decorative concrete got popular in the nineties, so some patios and pool decks already carry an acid stain, a stamp pattern or an acrylic sealer. A fresh coating over one just peels.
Old acrylic sealers have to be stripped before anything new goes on.
Around Baton Rouge the Mississippi is lined with refineries, chemical plants and terminals, and the shops, warehouses and contractors that serve them fill the roads behind the levee. Around East Baton Rouge Parish, the floor work is mostly this: plant floors, school kitchens, storefronts and flood-soaked houses around Baton Rouge, each one tested for moisture before anything goes down. Close by, typical homes run from about 1975 in Westminster to 2003 in Gardere, and Oak Hills Place sits on the newer side of that spread.
Oak Hills Place sits in East Baton Rouge Parish, part of the Baton Rouge area, which takes in the state capital, the plants strung along the river and a ring of fast-growing suburbs.
Stand-alone houses make up the bulk of it, roughly 66%. Detached homes usually come with garages that double as workshops, gyms and storage. A coating for that kind of use has to shrug off dropped tools and dragged gear.
That mix decides who calls: owners redoing a garage or patio, landlords between tenants, or a business with a shop or a kitchen.
What the weather does to a slab
The Baton Rouge area.
Oak Hills Place is in East Baton Rouge Parish, about 70 miles northwest of the shop.
In August 2016 days of rain pushed the Amite and Comite rivers out of their banks and flooded a wide stretch of the capital area. Floors that sat under that water came up with ruined tile, swollen wood and slabs carrying silt. A slab that got covered back over in a hurry during the rebuild can still hide that residue. When we take up a floor like that, we grind down to clean concrete, test the moisture and repair what the water left before any new system goes on.
If the building took water in 2016, plan on pulling up whatever went down afterward and testing the concrete underneath before choosing a new system.
Polished concrete suits a lot of older retail space in the capital area, provided the slab is still sound once the old tile and glue come off.
For a plant floor, tell us what rolls across it and what gets spilled on it, because wheel loads and chemicals decide both the resin and the thickness.
Systems that hold up here
Garage Floor Coatings
Flake, solid color, metallic or polished concrete for home garages, ground first so hot tires and oil never lift it.

Patio Coatings
Overlays, stamped patterns and stain for covered and open patios and porches, finished with a topcoat that grips in the rain.

Concrete Staining
Reactive acid stain that gives a slab mottled, variegated color, scored or stenciled if you want a pattern, then sealed.
How any floor here gets built
The same order on every job, whatever the system.
The finish you actually walk on, matched to the use.
Where the system gets its build: resin, cement or a decorative overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
Whatever the slab is, it gets read first: moisture, cracks, old coatings, and how level it sits.
The next towns over
- Village St. George
1.4 miles away, East Baton Rouge Parish
- Inniswold
2.1 miles away, East Baton Rouge Parish
- Westminster
2.6 miles away, East Baton Rouge Parish
- Gardere
2.9 miles away, East Baton Rouge Parish
More in East Baton Rouge Parish, on the services page and in the gallery.
Straight answers on floors
Or send the plans first.
A two-minute call usually settles it.
(504) 231-6298Do you come out to Oak Hills Place?
Yes. Oak Hills Place is about 70 miles northwest of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1996?
If the floor took water in a later storm, look for drywall mud and mold-treatment residue near the walls. It all grinds off, and we check moisture before we coat.
Can you redo a floor that went under in the 2016 flood?
Yes. We take off whatever was laid over it, grind the slab back to sound concrete and test it for moisture. Cracks, spalls and loose patches get repaired before the new system goes down.
Are the new slabs in the suburbs around Oak Hills Place ready to coat?
Not always on the builder’s schedule. Fresh concrete gives off water for weeks, and coating it early is how floors blister. We test it, and when the date cannot move we use a primer or a urethane cement made for damp concrete.
Is Oak Hills Place close enough for you to take the job?
Yes. The Baton Rouge area is inside the region we cover from Harvey, and we plan the drive so the crew gets full days on the floor. A contractor can send drawings, square footage and the schedule, or Dustin can come out and look at the slab.
Will your crew work inside a plant with permits and safety orientations?
Yes. Plant and government work comes with site safety rules, and we have worked under a strict safety officer on a government job. Send the scope, the chemical exposure and the shutdown dates, and we will price a system that fits them.
Can you work around our business hours?
Commercial jobs often run nights, weekends or inside a planned shutdown window. Tell us when the floor has to be back in service and we build the sequence backward from that date.
What do I need to do before the crew shows up?
Clear the floor completely, including shelves, stored items and anything you want moved. Make sure the crew has access to power and water. After that, stay off the slab once prep starts.
My slab sweats in the summer. Is that a problem?
It means moisture is reaching the surface, from below, from the air or both. We test to see which, then pick a primer and system that can handle it. Coating a sweating slab without that step is how floors peel.
Call it in or send the plans
Call with the address and what the floor has to survive. Someone will come look at the slab before anybody talks price.
Send the plans
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.