Houses or warehouses, New Orleans Station gets the same crew
With New Orleans Station sitting 4.9 miles southeast of Harvey, a site visit is a normal day for us. Dustin looks at the slab and asks about traffic and timing, then Jacob’s crew takes it from there.
New Orleans Station, Plaquemines Parish, Louisiana.
What kind of place New Orleans Station is
Housing figures from the US Census.
Half the homes in New Orleans Station are older than about 1997 and half are newer, according to the Census. Garage floors from this decade often have tire marks burned into an old sealer and oil soaked in under where the car leaks. Hot tire pickup is why we prefer a ground slab and a real primer.
Oil spots get cleaned and tested so the coating grabs there too.
Under a raised house in New Orleans Station, the ground-level slab often does the hard jobs like parking, storage or a workshop, and it is the floor that takes water when storms push in.
Stand-alone houses are only about 5% of the housing here. In a community where attached housing is the norm, ground-floor units on slab are good candidates for polished concrete. It is hard to damage and easy to hand to the next tenant.
Property managers handle a lot of the housing here, and they usually want a firm price and the shortest possible downtime.
New Orleans Station is in Plaquemines Parish, low country between the river and the Gulf marshes, where salt air and storm water shape how buildings get put together. Around Plaquemines Parish, the floor work is mostly this: oilfield and marine shops, dock buildings and raised homes down the river road, where salt air and storms decide what lasts. The nearest towns on our list range from Timberlane (typical home around 1977) to Estelle (around 1986); New Orleans Station lands on the newer side.
Sun on outdoor slabs
Lower Plaquemines and the river delta.
New Orleans Station is in Plaquemines Parish, about 4.9 miles southeast of the shop.
The delta takes the brunt of storms coming off the Gulf. Katrina made landfall near Buras in 2005, and later storms have pushed water over the same ground. Floors here should be built on the assumption that they will get wet again. That means systems that tolerate being washed out and dried, textured finishes so nobody slips on a wet coating, and surfaces that let mud and silt be pressure washed off once the water goes down.
Dock-side and processing floors need a textured topcoat, because boots, fish slime and saltwater make a smooth coating dangerous within hours of opening.
Plan floor work for the calmer months when you can, since hurricane season can push a schedule around anywhere in the delta.
For the slab under a raised house in New Orleans Station, pick a flake or slip-resistant system that can be hosed off and does not mind getting wet.
Our picks for New Orleans Station

Concrete Polishing
Mechanical grind and polish of the existing slab, densified and guarded, for showrooms, warehouses, restaurants and offices that want a bright floor.

Pool Deck Coatings
Textured overlays and flake decks in light, cooler colors, sealed with grit and built to live with chlorine, salt and wet feet.

Commercial Kitchen Flooring
Urethane cement and slip-resistant floors with integral cove base for restaurants, school and hotel kitchens, and bars that get mopped every night.
How any floor here gets built
The same order on every job, whatever the system.
Topcoat or guard, set to the traffic and the shine you want.
The color and the thickness: epoxy, urethane cement, stain or an overlay.
Soaks in and locks the system to the concrete.
Ground or shot blasted until the surface opens up and a coating can bite.
The concrete as we find it. Moisture, old sealer and cracks decide everything above it.
The next towns over
- Belle Chasse
2.5 miles away, Plaquemines Parish
- Woodmere
3.2 miles away, Jefferson Parish
- Timberlane
3.4 miles away, Jefferson Parish
- Estelle
4.3 miles away, Jefferson Parish
More in Plaquemines Parish, on the services page and in the gallery.
New Orleans Station floor FAQ
Or send the plans first.
Easier to talk it through? Call the shop.
(504) 231-6298Do you come out to New Orleans Station?
Yes. New Orleans Station is about 4.9 miles southeast of our base in Harvey, inside the roughly 100 miles we cover. Someone comes out, looks at the slab and gives you a price after seeing it.
What should I know about a slab from around 1997?
If the floor took water in a later storm, look for drywall mud and mold-treatment residue near the walls. It all grinds off, and we check moisture before we coat.
How long after a storm can a flooded slab be coated?
Only after it has dried and tests within the system’s moisture limits. That can take a while on a low slab with water close underneath, which is why moisture-tolerant primers exist. We test the slab and go by the reading.
What coating works on a slab that floods?
A system that bonds to well-prepared concrete and tolerates being washed out, usually a flake epoxy or a urethane with a textured topcoat. After a flood we clean the slab, let it dry, test it and repair anything loose before recoating. No coating seals a slab against water from below, so moisture is always part of the plan.
Which finish keeps people from slipping on a wet working floor?
A broadcast system, with flake or aggregate locked into the topcoat, gives grip when the floor is wet. We set the texture to the job, coarser for washdown areas and finer where carts roll. A smooth gloss floor is the wrong pick for a dock, a processing room or a boat shop.
How should the floor look when Dustin arrives?
Clear enough to see bare concrete in a few spots. If the slab is under carpet or tile, pull back a corner where you can. Ten seconds of looking at the real surface tells us more than any description.
When can I walk on it?
Light foot traffic is typically fine within a day on most coatings, and full cure takes longer. We give you the timing for your system, because urethane cement, epoxy and polished concrete all behave differently.
Does anyone need to be home during the work?
Only for access at the start and a walkthrough at the end, unless you want to watch. Grinding is loud, so pets and kids are better off somewhere else that day.
Can you coat floors in New Orleans Station in the middle of summer?
Yes, with some adjustments. Heat shortens working time, so the crew mixes smaller batches and may start early in the day. Humidity matters most for the slab underneath, which we test either way.
Pick your way in
Five minutes on the phone usually tells us whether it is a grind and seal, a coating or a polish.
Send the plans
Bidding a job? Send the plans and the schedule. We price from drawings and walk the slab before we commit to a date.