Terrazzo poured new, and old terrazzo brought back
Terrazzo is chips of marble, glass or granite locked in a binder, then ground flat and polished. We pour epoxy and cementitious terrazzo, and we grind and polish old terrazzo that has gone dull under decades of wax.
22 years in businessDecorative5.0 on Google from 36 reviews
What it is
Terrazzo goes back centuries, and it is still one of the hardest-wearing floors you can put in a public building. The idea is simple. You set metal divider strips into a pattern, fill each field with a binder full of marble, glass or granite chips, let it cure, then grind it until the chips show through flat and polish it to a shine. The strips hold the colors apart and the design together.
There are two kinds. Epoxy terrazzo is thin, typically a quarter to three-eighths of an inch, cures fast and takes bright colors and tight curves, which is why newer lobbies, schools and airport concourses tend to run it. It also wants a crack isolation membrane over most slab cracks and joints, or a crack in the slab will show straight through the floor. Cementitious terrazzo is the older way: a thicker bed of cement and chips that needs a structure built for the weight, and the kind people find under carpet and tile in older New Orleans buildings. We install both and will tell you which one your slab can carry.
Restoration is the other half of terrazzo work. Old terrazzo is usually sound underneath. It is buried under wax, sealer, carpet glue and stains that soaked in where the surface was left open. We strip it, grind out the lippage and scratches, fill cracks and missing chips with matched epoxy, then hone and polish it back to a clean floor. Matching a missing chip is the slow part, and we do it by eye against the floor around it. Terrazzo differs from polished concrete because the chips and the strips were placed on purpose; polished concrete shows whatever stone happened to be in the pour.
Part of our decorative work. See all of it.
Start with the concrete.
What goes down, from the surface you walk on to the slab under it.
We will not wax over a dull terrazzo floor to make it shine for a week, because the wax is usually why it went dull in the first place.
Ground and polished
Grinding opens the chips flat, a grout coat fills pinholes, and fine grits and a sealer finish the floor you walk on.
Matrix and chips
Epoxy or cement binder loaded with marble, glass or granite chips, troweled into each field.
Divider strips
Zinc, brass or plastic strips set to the pattern, with strips landed over the slab’s control joints.
Membrane and primer
Crack isolation goes over joints and cracks, then a primer so the matrix bonds to the slab.
Slab as found
The concrete with its joints, cracks and moisture, all mapped before anything goes down.
Where it belongs
Lobbies and atriums
Big open floors where a logo, a compass or a map can be laid into the pattern and still be there decades on.
Schools and campuses
Corridors and cafeterias that take carts, chairs and a whole student body every day and get mopped every night.
Airports and public halls
Concourse-type floors where foot traffic never stops and the floor has to look the same years from now.
Older buildings
Older storefronts, churches, schools and office lobbies around New Orleans where terrazzo sits under carpet or tile.
How the crew runs it
Five steps, in order.
Walk the floor
We look at the slab or the old floor, test moisture, map cracks and joints, and go over the pattern or the drawings.
Prep and isolate
The slab gets shot blasted or ground to the right profile, then cracks and joints get isolated.
Strips and pour
Divider strips go down to the layout, each field gets its matrix and chips, and it cures before anyone touches it.
Grind and grout
Coarse grinding exposes the chips flat, then a grout coat fills voids and we step up through the grits.
Polish and seal
Final polishing brings the shine, a sealer goes on, and we walk the floor with you before we leave.
For the GC or the facility
- Submittals, chip samples and divider layouts on request, so color gets approved on a real sample.
- New installs typically need the slab cured and dry, the other trades out of the way, and a clear floor while it grinds.
- Grinding is wet and loud, so on restoration we can work nights or inside a shutdown window.
- Pattern and logo drawings need to be final before strips go down.
Gulf South conditions
A terrazzo floor itself handles Gulf weather well. The slab under it is the problem. On-grade slabs here pull moisture up from a high water table, and epoxy terrazzo laid over a wet slab can blister or lose its bond. We test vapor before we price the system, and when the readings run high the answer is a moisture-mitigating primer or a cementitious system.
Restoration jobs bring their own trouble. Plenty of old terrazzo in the city has sat under floodwater at some point, or under carpet that held damp against it for years, and that shows up as stains, loose strips and hollow spots. Humid air also slows how fast grout coats and sealers dry, so we plan the polish passes around the weather and keep air moving in the building. A building near the coast gets salt and sand tracked in, which wears a polish faster at the doors.
Look at the finish.
“The craftsmanship and attention to detail really show. They were professional, punctual, and kept the work area clean throughout the project.”
Hang Pham, Google review5.0 on Google from 36 reviews
Living with it
Dust mop daily and damp mop with a pH-neutral cleaner made for terrazzo. Keep acids, vinegar, bleach and harsh degreasers off it, since they etch the marble chips and eat the sealer. Put walk-off mats at the doors to catch sand and grit. Skip the wax, because buffing the polish is what keeps it bright.
Next to this one
See finished floorsQuestions about terrazzo flooring
See finished jobs in the gallery, or drop the office a line.
Is epoxy or cementitious terrazzo better?
It depends on the slab and the building. Epoxy is thinner, lighter, quicker to cure and takes brighter colors. Cementitious is heavier and older in style, and it is often the right match when you are patching or extending an existing cement terrazzo floor.
Can you restore the old terrazzo under our carpet?
Usually, yes. Once the carpet and glue come up, we can see what is sound, fill cracks and missing chips, and grind and polish it flat. Some floors need more patching than others, so we look at it before we price it.
How long does a new terrazzo floor take?
Longer than a coating. Strips, pour, cure, grinding and polish are separate stages, and the size and pattern of the floor set the pace. We give you a schedule with the quote once we have seen the drawings.
Will cracks in the slab come through?
They can if nobody deals with them. We map cracks and joints first, put crack isolation over them and land divider strips on the control joints. That keeps slab movement from writing a line across the pattern.
Is terrazzo slippery?
Polished terrazzo is smooth, and a wet floor near the doors gets slick like any hard floor. Mats at the entries, a cleaner made for terrazzo and no wax buildup go a long way. On ramps or wet areas we can talk about a less polished finish.
Can you match the old colors and chips?
Close, though never perfect. Old marble chips came from batches you cannot buy anymore, so we blend what is available and test patches on site before filling the real floor. Up close you may find the repair, and from standing height it should read as one floor.
Let’s look at your floor.
Tell us the space, the square footage and what goes on the floor. We will tell you which system fits and when we can start.
General contractors: send drawings, square footage, finish schedule and the window you have. Submittals and samples on request.